<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />March 18, 1996, 42-inch sluice gate delivered to jobsite. <br /> <br />March 28, 1996, contractor installing gates. <br /> <br />April 10, 1996, contractor completed grouting of gates. Gate installation is complete. <br /> <br />Grouted Rip Rap <br /> <br />March 20, 1996, contractor began placing rip rap (modification) at entrance structure. <br /> <br />April 1, 1996, contractor completes placing rip rap and grouting of rip rap is done. <br /> <br />Reference Photos: CN-1745-417-113NA <br /> <br />Cleaning of rip rap at entrance structure (Modification work) prior to placement of grout. <br />Note: aluminum sluice gates in position. <br /> <br />Metalwork <br /> <br />March 20, 1996, trash racks, bar racks, horizontal channels for baffles at entrance structure, and <br />various "f' beams for grating supports were delivered onsite. <br /> <br />March 28, 1996, contractor installing bar and trash racks. <br /> <br />April 23, 1996, contractor begins to set aluminum baffles. All baffles are in place on April 25, <br />1996. <br /> <br />April 26, 1996, "V" trap delivered and installed. <br /> <br />Reference Photos: CN-1745-417-46NA, CN-1745-417-50NA, CN-1745-417-57NA, <br />CN-1745-417-61NA, CN-1745-417-64NA, CN-1745-417-66NA, CN-1745-417-72NAand <br />CN-1745-417- lO7NA <br /> <br />Storage Shed aDd Covered Work Area <br /> <br />April 15, 1996, carpenter crew installs bottom plate for storage shed. <br /> <br />April 16, 1996, carpenter crew installs 2"X4" walls, 2"X6" trusses, and If2 inch CDX plywood at <br />storage shed. <br /> <br />April 26, 1996, carpenter crew begins work on covered work area. <br /> <br />Const-13 <br />