Laserfiche WebLink
1 <br /> <br /> <br />r <br />Table 1-4. Cost of Screens Installed on HPP Trashracks <br />Item Cost ($) <br />Mobilization (5%) 40,000 <br />Fish Screens 420,000 <br />Trash Rake 210,000 <br />Conveyor 120,000 <br />Subtotal 790,000 <br /> <br />Unlisted Items (10%) 80,000 <br />Contract Cost 870,000 <br />Contingency (25%) 230,000 <br />Field Cost 1,100,000 <br /> The third option would place the fish screens on the discharge side of HPP just downstream of the <br /> Buckskin Mountains Tunnel. The fish screens would create a barrier to live fish that have passed <br /> HPP and concentrate them into a bypass channel where they will be killed or separated from the <br /> flow. Fish will either be comminuted, electrocuted, or pumped with the debris to the desert or to a <br /> separator structure. The water from the separator structure would be pumped back into the canal. <br /> The separated fish and debris would need to be handled. Screens that could be used at this location <br /> in the canal include, (1) vertical wedgewire screens in either a linear or "V" configuration (or <br /> multiple "V"), (2) horizontal rotating drum screens, (3) traveling screens, or (4) modular incline <br /> screens. Screen opening size has not been determined, but the intent is not to exclude small or <br /> passive life forms. Assuming that vertical wedgewire screens were chosen, this option would require <br /> installing the screens, baffles, screen cleaners, comminutors or electric barriers, structures to support <br /> the screens and comminutors, and a bypass pipe and/or channel. The major cost items and <br /> assumptions are included in Table 1-5. <br />Table 1-5. Cost of Screens on the Discharge Side of HPP <br /> <br />f <br />1 <br />t <br />Item Cost ($) <br />Mobilization (5%) 400,000 <br />Fish Screen Structure (Civil) 6,000,000 <br />Fish Screens 800,000 <br />Baffles 700,000 <br />Screen Cleaners 150,000 <br />Grinders 150,000 <br />Subtotal 8,200,000 <br /> <br />Unlisted Items (10%) 800,000 <br />Contract Cost 9,000,000 <br />Contingency (25%) 2,000,000 <br />Field Cost 11,000,000 <br />Control Structure Feasibility Evaluation <br />Miller Ecological Consultants, Inc., February 18, 1997 <br />1-32