Laserfiche WebLink
<br />r <br />1 <br />FINAL REPORT <br />UPPER COLORADO RIVER BASIN <br />RECOVERY IMPLEMENTATION PROGRAM <br />FEASIBILITY EVALUATION OF NON-NATIVE FISH <br />CONTROL STRUCTURES <br />Prepared for: <br />Colorado River Water Conservation District <br />Glenwood Springs, Colorado <br />Prepared by: <br />William J. Miller <br />Miller Ecological Consultants, Inc. <br />1401 Riverside Ave., Suite 3 <br />Fort Collins, Colorado 80524 <br /> <br />I? <br />1 <br />1 <br />with assistance from <br />Doug Laiho <br />Ayres Associates <br />3665 JFK Parkway, Bldg. 2, Suite 300 <br />Fort Collins, Colorado 80525 <br />February 18, 1997