Laserfiche WebLink
<br />-Travel 5,000 $ 5,000 <br />-Equipment 3,000 $ 3,000 <br />-Total 31,800 $31,800 <br />-Grand Tot. $63,600 <br />Task 2 Availability and quality of nursery habitat for Colorado <br />squawfish in the Green River. <br />Description of work: <br />An ongoing SDCR project which is under the lead of the UDWR. <br />The primary goals are to determine the relationship between <br />Colorado squawfish nursery habitat availability and recommended <br />flow releases from Flaming Gorge Dam and the relationship <br />between nursery habitat availability and usage. Objectives <br />include assessing applicability and usefulness of videoimagery <br />and conducting a comparison of the information collected with <br />ISMP to assess ways of refining standardized monitoring <br />procedures and making the most of data currently being <br />collected. Reclamation will assist UDWR by providing requested <br />flows from Flaming Gorge whenever possible and providing <br />necessary support and expertise for conducting video imagery <br />research. <br />The study on availability and quality of nursery habitat will <br />be conducted in the Jensen-Ouray and Mineral Bottom areas (Green <br />River). The ISMP will collect data on the late summer/fall <br />relative abundance and size of age-0 Colorado squawfish (and <br />other co-occurring fishes) in backwater habitats in <br />representative reaches. Most age-0 Colorado squawfish of <br />sufficient size for field identification will be released after <br />capture; small sub-samples will be preserved (ethanol) for <br />laboratory studies on age, condition, etc. Measurement of <br />selected physicochemical parameters will be conducted. Video <br />imaging of nursery habitats will be conducted concurrently. <br />The task is an important for refining the summer/fall flow <br />recommendations for Flaming Gorge operations. <br />Deliverables: <br />UDWR will provide annual reports which will document the status <br />of research relating to the task's goals and objectives, and a <br />final report. <br />Budget': <br />-Labor $24,300 <br />-Travel $ 4,500 <br />-Equipment $ 9,000 <br />'Does not include FWS overhead <br />B2