Laserfiche WebLink
The pending agreement for the 300 cfs instream water rights <br />features the following accommodations: <br />1. It recognizes that irrigation diversions under the <br />senior water right for the Gunnison Tunnel can be increased, but <br />that such increases will be limited to the historic pattern and <br />duration of the irrigation season and that the Water Users can <br />generate hydropower at the same time that they are making these <br />irrigation diversions. The instream right for 300 cfs then takes <br />priority ahead of the junior water rights for hydropower at the <br />Gunnison Tunnel after the stipulated increases for irrigation <br />purposes. <br />2. Except for any other water rights which The Nature <br />Conservancy may acquire from the Pittsburg and Midway Company, <br />the agreement leaves open the question of whether other purchased <br />or donated water rights with priorities senior to the hydropower <br />rights at the Gunnison Tunnel can be stacked on top of the 300 <br />cfs water right. The question of whether purchased or donated <br />water rights can be stacked for instream use probably depends on <br />whether the upstream draft of these water rights was or could be <br />cumulative prior to their change to instream use. For example, <br />irrigation water rights that were directly across from each other <br />on a stream might be stacked for instream use, while hydropower <br />water rights that were one above the other on a stream where the <br />return flow from the upstream water right would make water <br />13