<br /> <br />plant began commercial power production September 13, 1967, and <br />the second on November 11, 1967, <br /> <br />Morrow Point Dam <br /> <br />Morrow point Dam and excavation for the underground power- i <br />hou,e have heeu fin;,hed. Impoundment of wate< wa' ;n;tiat<d ;n I <br />Morrow point Reservoir on January 24, 1968, The reservoir is used I <br />for reregulating releases from Blue Mesa. I <br /> <br />The contmct lor completing Mmrow point Pnw"plant w" I <br />awarded January 13,1969. The cootmctor ha' completed the 138-kv I <br />Morrow point-Curecanti station service transmission line, except for f <br />cepair or ceplacement 01 damaged conductnr. Wood polae have been l <br />,et and guy anchore ;n,taUed foc the termination 01 the 230-kv Mnr- l <br />roW pointb-cu<ccanti tcan,m;"ion line. The Moccow point ,w;tchy.rd " <br />area haa ecn leveled and cnncrete atructure loundation, were placed I <br />before outside work was suspended for the winter. In the powerhouse, <br />the contractor has completed second stage concrete encasement of the <br />draft tube and scroll case for the Unit No.1 turbine and is preparing <br />to place concrete for the generator foundation. The draft tube and <br />scroll case have been set in place, aligned, and hydrostatic pressure <br />tested for the second turbine, Concrete embedment is expected to <br />commence immediately. Both generating units at Morrow point are <br />scheduled to be completed during 1970, <br /> <br />Crystal Dam <br /> <br />Crystal Damsite, downstream from Morrow point Dam and <br />immediately upstream from the Black Canyon of the Gunnison Na- <br />tional Monument, is the site of the third and final dam of the Cure- <br />canti Storage Unit. A 6.5-mile access road was completed to the dam- <br />site in November 1965, Completion of Crystal Dam will release Mor- <br />row point Reservoir from the obligation of meeting the schedule for <br />diversion of water through the Gunnison Tunnel. This will alloW use <br />of the second Morrow point generator for firm power-peaking, thuS <br />adding another 60-megawatts of firm capacity to the power system. <br />Limitation of funds has delayed start of construction of Crystal Darn. <br /> <br /> <br />Recreation facilities <br /> <br />The National Park Service is continuing development of recIt- <br />ation facilities at Elk Creek adjacent to U. S, 50 on Blue Mesa Lake <br />and at Iola across the lake and toward the upper end. Boat ramP' <br />__~_l,;""lT "'rp3S. picnic and camping facilities are available at these ~E <br />_~~..l ~+ 'R.lu- (;reek. RecreatiOfl~ <br /> <br /> <br />~"(jl'Ow <br /> <br />POint Do Bureau of R I ' <br />fcC" m, Cureconfi Sto ec amallOn Photo <br /> <br />. I per <pr,..,n~ ~f ..._.__ ,~~?e Unit, Colorado, About 2000 ' <br /> <br />LL _ 1.1 "',' cubiC <br />