Laserfiche WebLink
<br />List Of Tables <br /> <br />April 2004 <br /> <br />LIST OF TABLES <br /> <br />Table Page <br /> <br />3-1 Recommendations for spring peak flows by hydrologic condition for Reach 2 (Yampa <br />River to White River) to benefit endangered fishes in the Green River downstream of <br />Flaming Gorge Dam ................................................... 3-4 <br /> <br />4-1 Areas of floodplain inundation in the three priority reaches of the Green River <br />Subbasin at full inundation potential, and at flows of 18,000 cfs and 1,560 cfs ..... 4-4 <br /> <br />4-2 Total numbers of razorback sucker larvae potentially entrained in floodplains of each of <br />the three priority reaches of the Green River at full inundation potential and at flows of <br />18,200 cfs and 1,560 cfs ................................................ 4-4 <br /> <br />4-3 Location, acres inundated, and ownership of 16 priority floodplain sites in the Split <br />Mountain to Desolation Canyon reach. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8 <br /> <br />5-1 Summary of objectives and management actions for the three priority reaches of the <br />Green River Subbasin ................................................. 5-11 <br /> <br />6-1 Acres of inundation at 13,000 cfs and 18,600 cfs and summary of previous actions on 16 <br />floodplain sites in the Split Mountain to Desolation Canyon Reach of the Green River <br /> <br />Subbasin. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 <br /> <br />6-2 Summary of site features, objectives, and management actions for each of the 16 priority <br />floodplains of the Split Mountain to Desolation Canyon reach. . . . . . . . . . . . . . . . . . 6-33 <br /> <br />7 -1 Summary of acres restored by floodplain type for 16 sites in the Split Mountain to <br />Desolation Canyon reach at 18,600 cfs flows of the Green River at Jensen, Utah. . . . 7-2 <br /> <br />7-2 Floodplain area (acres) needed to meet 30% average annual recruitment for a razorback <br />sucker population of 5,800 adults, based on three levels each offish density and growth <br /> <br />rate ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4 <br /> <br />7-3 Summary of management actions and success criteria for each prioritized floodplain site <br />in the Split Mountain to Desolation Canyon Reach. . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6 <br /> <br />VI <br />