Laserfiche WebLink
<br />3.0 Scientific Basis And Underlying Principles <br /> <br />3-4 <br /> <br />April 2004 <br /> <br />Table 3-1. Recommendations for spring peak flows by hydrologic condition for Reach 2 (Yampa River to White River) to benefit <br />endangered fishes in the Green River downstream of Flaming Gorge Dam (excerpted from Muth et al. 2000). <br /> <br /> Hydrologic Condition <br />Criteria Wet Moderately Wet Average Moderately Dry Dry <br /> (0 to 10% (10 to 30% (30 to 70% (70 to 90% (90 to 100% <br /> Exceedence) Exceedence) Exceedence) Exceedence) Exceedence) <br />General Peak flows in Reach 2 should be of the magnitude, timing, and duration to provide floodplain inundation in the Ouray <br />recommendation portion of the river for at least 2 weeks in 4 of 10 years and at least bankfull flows in 1 of 2 years. In all years, peak <br /> flows should be of sufficient magnitude and duration to provide at least some in-channel habitat maintenance <br /> throughout the reach. No upper limits are placed on recommended peak flows in any hydrologic condition. The <br /> duration of peak flows less than 527 m3/s (18,600 cfs) should be limited, because neither floodplain nor backwater <br /> habitats are available at these flows. <br />Peak-flow magnitude ~748 m3/s (26,400 ~575 m3/s (20,300 ~ 527 m3 Is (18,600 ~235 m3/s (8,300 cfs) <br /> cfs) cfs) cfs) in 1 of 2 average <br /> years; ~235 m3/s <br /> (8,300 cfs) in other <br /> average years <br />Peak-flow duration Flows greater than Flows greater than 527 m3/s (18,600 cfs) Flows greater than Flows greater than <br /> 643 m3/s (22,700 cfs) 527 m3/s (18,600 cfs) should be maintained 235 m3/s (8,300 cfs) 235 m3/s (8,300 cfs) <br /> should be maintained should be maintained for at least 2 weeks should be maintained should be maintained <br /> for 2 weeks or more, for 2 weeks or more. in at least 1 of 4 for at least 1 week. for 2 days or more <br /> and flows greater average years. except in extremely <br /> than 527 m3/s dry years (~98% <br /> (18,600 cfs) for 4 exceedence ). <br /> weeks or more. <br />Peak-flow timing Peak flows should coincide with peak and immediate post-peak spring flows in the Yampa River. <br />