My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Request for Contractor Prequalification Draft
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Request for Contractor Prequalification Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:35 PM
Creation date
6/4/2009 1:35:49 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.600
Description
Requests for Proposals
State
CO
Basin
South Platte
Water Division
1
Date
11/3/2008
Author
PRRIP
Title
Request for Contractor Prequalification Draft
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w <br />. <br />PRRIP - ED OFFICE DRAFT 11/03/2008 <br />87 like fencing, well decommissioning and forest clearing will be conducted on a firm fixed <br />88 price basis. <br />89 • Time and Materials Contract - Typically used for labor intensive requirements where the <br />90 hours needed may depend upon variables not clarified until the work has started; services are <br />91 based upon direct labor hours at a specified fixed hourly rate and materials at cost (including <br />92 a material handling fee). Generally, the agreement provides for a not to exceed maximum <br />93 expenditure. Services like noxious weed control, understory clearing and channel discing will <br />94 be conducted on a time and materials basis. <br />95 <br />96 III. SUBMISSION REQUIREMENTS <br />97 All interested parties wishing to become prequalified must complete the attached Contractor <br />98 Prequalification Form in its entirety and submit it to the Executive Director's Office. All answers <br />99 and entries on the form must be specific, complete in detail, and typewritten or printed. <br />100 Completion in pencil is not acceptable. Brochures and other information may be furnished to <br />101 supplement the form; however, it is essential that the form be completed in full. No fee is <br />102 required to prequalify. <br />103 <br />104 Instructions for Submitting Prequalification Form <br />105 One completed copy of the Contractor Prequalification Form must be submitted to the Executive <br />106 Director's Office no later than S: 00 p.m. Central Time on .Ianuary 31, 2009. The mailing <br />107 address is: <br />108 <br />109 Platte River Recovery Implementation Program <br />110 3710 Central Avenue, Suite E <br />111 Kearney, NE 68847 <br />112 <br />113 Questions regarding the information contained in this RFCP can be submitted to Jason <br />114 Farnsworth by email (farnsworthjgheadwaterscorp. cona) or by telephone at (308) 995-8208. <br />115 <br />116 Criteria for Evaluating Prequalification <br />117 The Executive Director's Office will investigate and examine the application of all contractors <br />118 applying for prequalification. Prequalification status will be primarily based on the following <br />119 criteria: <br />120 <br />121 • financial responsibility of the contractor <br />122 • experience example projects provided for each work class <br />123 • the performance record of the applicant as related to project references <br />124 • the contractor's equipment and machinery <br />125 • whether or not the contractor has been previously denied pre-qualification, and if so, for <br />126 what reason <br />127 <br />128 Notice of Prequalification Status <br />129 After completing the evaluation of prequalification applications, the Executive Director's Office <br />130 will notify the contractor of their prequalification status. The prequalification term will be three <br />Page 3 of 4
The URL can be used to link to this page
Your browser does not support the video tag.