My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Platte River Water Supply Update (3)
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
North Platte River Water Supply Update (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:32 PM
Creation date
6/4/2009 11:18:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
4/16/2008
Author
Bureau of Reclamation (WY Area Office)
Title
North Platte River Water Supply Update
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
dL <br />,4. <br />Wyoming Area Office <br />Bureau of Reclamation <br />Page 2 of 2 <br />Basin. The operating plans are updated monthly to reflect changing inflow conditions. This <br />report focuses on the information associated with the April expected operating plan. <br />Table 1 also includes the accompanying information for water year 2007 and the 30-year average <br />(1978-2007) for comparison. Graph 1 through Graph 3 displays this information in graphical <br />format. Based on the April expected North Platte River Operating Plan, the North Platte <br />Pathfinder ownership (refer to NPRAOP page 3) is estimated to reach a maximum ownership <br />content of 954.2 kaf by the end of June, approximately 62 kaf short of filling. <br />Assuming the Pathfinder Modification Project was in operation and a North Platte Pathfinder <br />ownership accrual of approximately 669.1 kaf, the Pathfinder Environmental Account would be <br />estimated to have accrued approximately 21.3 kaf and the Wyoming Account would be estimated <br />to have accrued 12.5 kaf (approximately 3.18% and 1.87% of the 669.1 kaf Pathfinder accrual, <br />respectively). <br />The Glendo and Kendrick ownerships would not fill given expected inflow and outflow <br />conditions. In addition, the Glendo and Kendrick ownerships are not expected to come into <br />priority for accrual in 2008. For the Glendo Ownership this is due to the anticipation of May <br />releases from Guernsey Reservoir for irrigation, which will draw the lower reach gain through <br />for delivery. The Kendrick Ownership would only come into priority if Pathfinder fills. <br />Releases from Guernsey Reservoir are expected to be in response to downstream demand. <br />Reclamation will continue to update the North Platte River operating plans on a monthly basis in <br />response to changing inflow conditions. Reclamation will prepare the determination of <br />forecasted supply estimate again on May 1 and June 1 with regard to the need to allocate storage. <br />For additional information regarding current reservoir contents and releases, please call toll free <br />1-800-253-8737 or visit our website (http:/www.usbr.gov/gp) and follow the water operations <br />link to access Reclamation's HydroMet Data system.
The URL can be used to link to this page
Your browser does not support the video tag.