My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Management Study: Phase 1 Report
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Management Study: Phase 1 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:12 PM
Creation date
6/2/2009 12:32:46 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.100
Description
Adaptive Management Workgroup
State
CO
Basin
South Platte
Water Division
1
Date
1/29/2008
Author
Boyle Engineering, Ecological Resource Consultants, BBC Research & Consulting, Lytle Water Solutions
Title
Water Management Study: Phase 1 Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LIST OF TABLES <br />Table 2-1 Interview Participants....... <br />..........................4 <br />Table 3-1 Average Yields ..........................................................................................................6 <br />Table 3-2 Estimated Flow at NWS Flood Stage for Platte River Reaches ................................9 <br />Table 3-3 Table of System Capacities .....................................................................................14 <br />Table 3-4 Classification of Water Years Based on Average Annual Flow at Overton, <br />Nebraska (1947-2006) .................................................................................................16 <br />Table 3-5 Travel Times on the Platte River - Keystone to Overton .......................................18 <br />Table 3-6 Daily Loss Factor Estimates ....................................................................................20 <br />Table 3-7 Remaining Capacity for Program Water for Average, Wet, and Dry Years........... 23 <br />Table 3-8 Resulting Peak Flows for Target 5,000 cfs Case I and Case II ...............................31 <br />Table 3-9 Resulting Peak Flows for Target 800 cfs Case I and Case II ..................................32 <br />Table 4-1 Project Summary .....................................................................................................53 <br />LIST OF FIGURES <br />Figure 1-1 Study Area and Locations ...................................................................End of Report <br />Figure 3-1 Classification of Water Years Based on Average Annual Flow at Overton, <br />Nebraska (1947-2006) ................................................................................................ 15 <br />Figure 3-2 Hydrographs for 5,000 cfs Program Water Targets .............................................. 36 <br />APPENDICES <br />Appendix 1: WMS Interview Meeting Notes <br />Appendix 2: WMC Loss Model Update Technical Memorandum and Tables <br />Appendix 3: Routing Tool Analysis Results <br />930wLE Page iii <br />January 29, 2008 <br />PRRIP - Draft Water Management Study, Phase I
The URL can be used to link to this page
Your browser does not support the video tag.