My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Management Study: Phase 1 Report
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Management Study: Phase 1 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:12 PM
Creation date
6/2/2009 12:32:46 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.100
Description
Adaptive Management Workgroup
State
CO
Basin
South Platte
Water Division
1
Date
1/29/2008
Author
Boyle Engineering, Ecological Resource Consultants, BBC Research & Consulting, Lytle Water Solutions
Title
Water Management Study: Phase 1 Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 3-9 <br />Resulting Peak Flows for Target 800 cfs <br />Case I and Case II <br /> <br /> <br /> <br />ear <br />Class <br /> <br /> <br /> <br />cenario <br />Total <br />McConaughy <br />Release <br />ac-ft Total <br />Program <br />water at <br />Overton* <br />ao-ft Peak <br />Program <br />water 11ow <br />at Overton <br />cfs # Days <br />> 800 cfs <br />of <br />Program <br />water Total <br />Program <br />water <br />May-Sep <br />ac-ft <br /> <br />Shortage <br />on Peak <br />Da cfs <br />Target <br />Volume <br />Short <br />ao-ft <br /> <br />Typical <br />Month of <br />O erafion <br /> <br /> <br />ypical reasons for shortage to <br />ta et flow <br /> <br />Avera e <br />800 Case I <br />342,900 <br />246,200 <br />800 <br />136 <br />236,600 <br />N/A <br />6,100 <br />Ma -Se Keystone Div, North Platte Ramp, <br />North Platte River <br />Avera e 800 Case II 342,800 247,000 800 142 236,500 N/A 6,200 Ma -Se North Platte River choke oint <br /> <br />Wet 800 Case I 293,300 212,600 800 105 202,300 N/A 40,400 Ma -Se S stem enerall at ca aci <br />Wet 800 Case II 280,200 203,900 800 108 194,200 N/A 48,600 Ma -Se North Platte River choke oint <br /> <br /> <br />D <br />800 Case I <br />582,400 <br />243,100 <br />800 <br />120 <br />232,400 <br />N/A <br />10,400 <br />Ma -Se Keystone Div, North Platte Ramp, <br />North Platte River <br />D 800 Case II 580,900 243,100 800 124 231,600 N/A 11,100 Ma -Se North Platte River choke oint <br />' Total Program water reaching Overton for yeaz, including Tamarack I <br />BOWLE <br />Page 32 of 58 January 29, 2008 <br />PRRIP - Draft Water ManagementStudy, Phase I
The URL can be used to link to this page
Your browser does not support the video tag.