My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Management Study: Phase 1 Report
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Management Study: Phase 1 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:12 PM
Creation date
6/2/2009 12:32:46 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.100
Description
Adaptive Management Workgroup
State
CO
Basin
South Platte
Water Division
1
Date
1/29/2008
Author
Boyle Engineering, Ecological Resource Consultants, BBC Research & Consulting, Lytle Water Solutions
Title
Water Management Study: Phase 1 Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Travel time from the Keystone gage to North Platte is estimated to be 2 days. This <br />estimate is based on discussions with CNPPID and is supported by empirical <br />evidence in the stream gage data. Similarly, the travel time from the Roscoe gage on <br />the South Platte to the gage at North Platte is estimated to be 2 days based on stream <br />gage data. Travel time from North Platte (the confluence) to Brady on the Platte River <br />is estimated to be about 1 day. The actual travel time may be shorter than 1 day; <br />however, the 1 day timestep and the proximity of the Jeffrey Return to Brady support <br />this approximation. The next downstream reach terminates at the J-2 Return and the <br />Overton gage. These two locations are also grouped based on their proximity to each <br />other. The travel time for this reach is estimated to be 1 day. The total travel time <br />from Lake McConaughy/Roscoe downstream to Overton is thus approximated to be 4 <br />days. Table 3-5 entitled "Travel Times on the Platte River - Keystone to Overton", <br />summarizes the travel times incorporated in this study. <br />Table 3-5 <br />Travel Times on the Platte River - Keystone to Overton <br />Reach Upstream Downstream Approx. Travel <br /> Location Location River Miles Time <br />South Platte Roscoe, North Platte, North 50 2 Days <br />River - Nebraska Platte Hydro, and <br />Roscoe to CNPPID Diversion <br />North Platte <br />North Platte Lake North Platte, North 60 2 Days <br />River - McConaughy Platte Hydro, and <br />Keystone to CNPPID Diversion <br />North Platte <br />Platte River - North Platte, Brady, Nebraska 20 1 Day <br />Confluence to North Platte and Jeffrey Return <br />Brady Hydro, and <br /> CNPPID <br /> Diversion <br />Platte River - Brady, Nebraska J-2 Return and 50 1 Day <br />Brady to and Jeffrey Overton, Nebraska <br />Overton Return <br />13042E Page 18 of 58 January 29, 2008 <br />PRRIP - Draft Water Management Study, Phase I
The URL can be used to link to this page
Your browser does not support the video tag.