Laserfiche WebLink
41 1 <br />PRRIP - ED OFFICE DRAFT 6 09/13/2008 <br />• Water Acquisition <br />• Preliminary CY 2009 Estimated Budget =$500, 000 <br />• Pre-qualifying consultants for as-needed services to assist in evaluations. <br />• Establish a pool of money to fund acquisition of water supplies. <br />• Pulse Flow Bypass <br />• Preliminary CY 2009 Estimated Budget =$350, 000 <br />• Assuming the 2009 Pulse Flow to be a test pulse for purpose of institutional and <br />monitoring testing and model calibration data gathering. <br />• Power Interference and damage to District facilities. <br />• Water Quality Monitoring Implementation (under the AMP) <br />• Preliminary CY 2009 Estimated Budget =$100, 000 <br />• Protocol under development, EA Engineering, Science, and Technology Inc. <br />(contractor) and WQ Focus Group will assist in refining budget. <br />• Lower Platte Stage Change Study (under the AMP) <br />• Preliminary CY 2009 Estimated Budget =$200, 000 <br />• Second year of a three year study. <br />Page 3 of 3