My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Management Study: Phase 1
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Management Study: Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:05 PM
Creation date
6/2/2009 10:13:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.550
Description
Water Advisory Committee & Water Advisory Planning
State
CO
Basin
South Platte
Water Division
1
Date
2/13/2008
Author
Jeff Bandy & Blaine Dwyer
Title
Water Management Study: Phase 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Status of Pliase <br />Routing Analysis Approach <br />• Capacity constraints and ramping rates <br />• Travel Time and Losses <br />• Program Water at Overton include releases from Lake McConaughy <br />(Nebraska EA and PMP) and Tamarack I water <br />• Release from Lake McConaughy is not constrained - tn iilw.tratf. t(A;,i <br />required volume <br />Represent a 60 year period. 2 targets, and 2 Cases <br />Classified for Average, Wet, and Dry years <br />of Phase <br />5,000 cfs of Program Water <br />Case I (Districts Divert) <br />- 5,000 cfs pulse tlow achieved for 1 in 3 years, for one day only <br />- Peaks range irom 3,800 cfs to 5,200 cfs <br />- Required release from McConaughy: 72,000 ac-ft to 100,000 ac-ft <br />(Dry year and Wet year, respectively) <br />- Constraints include: <br />North Platte choke point and ramping rates <br />Sutherland Canal capacity and ramping rates <br />Johnson Lake reregulating capacity
The URL can be used to link to this page
Your browser does not support the video tag.