My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Management Study: Phase 1
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Management Study: Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:05 PM
Creation date
6/2/2009 10:13:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.550
Description
Water Advisory Committee & Water Advisory Planning
State
CO
Basin
South Platte
Water Division
1
Date
2/13/2008
Author
Jeff Bandy & Blaine Dwyer
Title
Water Management Study: Phase 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 5,000 CFS Target <br />Results for 5,000 cfs Target flows <br />Case II (Districts Bypass) <br />- 5,000 cis pulse flow not achieved <br />- Peak flow ot about 2,500 cfs for all year classifications <br />- Required release from McConaughy about 41,000 ac-ft to 46.000 ac <br />ft (Avg year and Wet year, respectively) <br />- Constraints include: <br />• North Platle choke point capacity of 3,000 cfs <br />35
The URL can be used to link to this page
Your browser does not support the video tag.