My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ovid Resevoir Phase 2
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Ovid Resevoir Phase 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:36:18 PM
Creation date
5/27/2009 9:49:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Platte River Water Issues
State
CO
Basin
South Platte
Water Division
1
Author
Unknown
Title
Ovid Resevoir Phase 2
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- ii. SCADA, telemetry and automation evaluation <br />iii. Revised construction cost estimates <br />iv. Facility Operations and Maintenance costs <br />v. Alternate points of diversion using well fields and/or other diversion <br />structures <br />1. Benefits of increased winter yield <br />2. Recapture of excess augmentation water and retiming <br />releases <br />vi. Design revisions from recent changes in Dam Safety Rules and <br />Regulations <br />c. Julesburg Irrigation District/Peterson Ditch <br />i. Winter Operations evaluation <br />ii. Reservoir Diversion Structure improvements <br />iii. South Platte Diversion Improvements <br />iv. Evaluation of Ditch Capacity & competition with irrigation, <br />augmentation, recharge and other operations <br />v. 404 Issues <br />d. Final design <br />i. Construction drawings <br />1. Potential addition of pump station and pipeline at the river <br />2. Potential modifications to Peterson diversion structure <br />3. Other potential modifications based on reservoir operations <br />analysis and/or preliminary engineering review <br />ii. Construction specifications <br />e. State Engineer submittal documents <br />i. Dam Safety permit services <br />1. Hazard Classification report <br />2. Hydrology study <br />3. Geotechnical report <br />4. Engineering Report <br />5. Water Diversion Control Plan <br />6. Instrumentation Plan <br />7. Monitoring Plan <br />8. Emergency Preparedness plan <br />f. Bid documents and Contract Agreements <br />i. Agreements and General Conditions <br />ii. Advertisement for Bid <br />iii. Pre-Bid meeting <br />iv. Bid assistance/Contractor Selection <br />v. Contract Management <br />g. Construction observation services/documentation <br />page 2
The URL can be used to link to this page
Your browser does not support the video tag.