Laserfiche WebLink
? <br />? <br />? <br /> ` e <br />L <br /> e` <br /> <br />a. Construction of more recharge pits/ponds <br /> <br />b. E3cttcr usr of alluvial aquifer storage (use of alternate points of divrrsion, <br />rccharge wells and augmentation wells) including porosity storage [what is this?] S<?L\ ?•„` r?•• ?l <br />c. Financial assistance for storage projects and augmrntation/rerharge projects <br />d. _Financial assistance for upgrading and reconstructing storage diversion oaiet, <br />structures and Feeder canals to alloN? rescrvoirs to fill sooner and altow senior call ro come off. <br />?- <br />c. titake a portion of savings from removal of phreatophytes available to thc / <br />X <br />remover <br />C CRf:P'E:QIP type programs available for farms on which wells curtailed <br />g. Allow aggregated, dcferrcd replacement of well depletions - this depcnds on <br />the ability of thc State Engincer to make a reliable dctermination that reservoirs are likrly to fill <br />in the upcoming scason. ?. <br />h. Amnesty on replacemcnt obligations for depletions resulting from pre-1974 <br />pumping <br />A1 ow - ay corrccUon pcriod-kr welt aLgmentation - <br />j. Allow projections that determine allowable wcll pumping tr>-be bascd gn <br />average pumping instead of 3 wor5tyeers -- _ -? <br />? k. Pursue voluntary agreements with downstream roservoirs (e.g., "Gentlcmcn's ? <br />? <br />Agreemcnt"). <br />-- <br />--- - <br />----------- <br />- <br />1 I. Authoriae rule meking bythe Statc Engineer. on what? <br />J m. „Po not require auementation for wells that are far from thc South Platte Ri?er ieeea: kcm.vc <br />(e.g„ upper Box Elder Creck, Qadgcr Creek and Beaver Creek) <br />n. Detcrmine sustainablc yield of basin (e.g., by SPDSS) jand allow wells to <br />purnp this yield without augnientation? <br />4 Nlaintain status yuo <br />a. Maintain Doctrinc of Prior Appropriation System- South Platte River basin is <br />over-appropriated and existing body of laws, policies and rules are not perfect but adequate to <br />prolect vested water rights. <br />b. Return flows have to be maintained - retum flows being affccted by limed <br />gravel pits, lined canals, more eflicicnt irrigation systcros, changes in cropping patterns, and <br />sevcral other faclors. LThi; i,n't status iluoJ <br />mven. i n- <br />1? ?