Laserfiche WebLink
Page 8 of 9 <br />McBrideWater <br />Town of Yampa Water Facilities Plan and Storage Tank Upgrades <br /> tion <br />k Descri <br />T Labor Milea a Re rodudions TOTAL <br />Task p <br />as McBride Waier Labor tabor * Cost DraMn s C s AI I <br />f McBride Water KM <br />100 1 <br />Hours <br />Gost E/mile <br />5 0,75 iF Elea <br />2.25 aR Stea <br />0 .1 Tasks <br /> <br />t Water Rights Review 0 <br />o E <br />a - 5 - <br />5 - S <br />s - S - <br />a - 50.00 <br />so.oo <br />2 Water Qual Review 20 20 S 2,000.00 5 S - $ - 52,000 ~ <br />_ 0 S - 5 - 5 - S - 50.00 <br />3 Water Infrastructure Review 0 5 - 5 - E - $ - 50-00 <br />3A Water Demands o 5 - 5 - s - 5 - So.oo <br />stem Fl <br />draulica <br />B S <br />3 0 S S - S - S - 50.00 <br />y <br />y <br />. <br />C Waler Tank Siling <br />3 0 5 - 5 S 5 50.00 <br />. 0 $ - S - S S 50.00 <br />4 Summary RepoA on Water mhastructure 0 S S S - S - 50.00 <br />4.A Current Status 20 20 $ 2,OOO.D0 5 - S 5 - 52,000.00 <br />4.B Mana i Growth Needs 20 20 S 2,000.00 5 - S - 5 - 52,000 00 <br /> o a - 5 - s - 5 - So.oo <br />.5 _ <br />Finandal Water Planrn 0 S - 5 - 3 5 - 50.00 <br /> 0 S - S - 5 - 5 - $O tx) <br />6 Sleel Treated Water Stora a Tank Construction Documents 0 S - S - S S - 50.00 <br /> 0 S S S S - 50.00 <br /> 0 5 - S S - S SO.DO <br /> 50.00 <br /> 60 S 6.000 0 S - 0 S 0 S 56,000 00 <br />Total Nours 60 60 (as check) <br />TOTAL 56,000 00 <br />Labor Cost 6.000 5 6,000 ,as check) <br />