Laserfiche WebLink
Page 6 of 9 <br />Resource Enginaenng <br />Town of Yampa Water Facilities Plan and Storage Tank Upgrades <br />Task Task Description Resource E +neenn Mde Re rpduGt~(1S TOTAL <br /># + Resource En ineerin Hours Cost # Cost Drawi s C es AI I <br />Resource Ertgineerirrg SF <br />t 35 RP <br />105 MM <br />50 Slmtle <br />$ 0 75 # ilea <br />2 25 # Slea <br />O t t Tasks <br /> <br />t :Water Rights Review 20 23 4 5 48 $ 5,340 00 22D $ 165.00 S 5 - 55, 505.00 <br /> o $ s - $ - $ - $0 00 <br />2 !Water auaGty Review 0 S S - S 5 $0 DO <br />---+---- 0 $ $ - S $ - $0 00 <br />3 I Water Infrastructure Review 0 $ S - $ - $ - $0 OG <br />3 A Waler Demands 0 $ $ - $ $ SO 00 <br />3 8 System FiydrauVics 0 $ - S - $ $ - S0 00 <br />3 G Water Tank Stung 0 $ - $ - $ - $_ - $0 00 <br /> 0 $ S - 5 - $ - $0 00 <br />a , Summary R on Water tntrastructure 0 $ S - 5 $ $0 00 <br />4.A Current Status 0 $ S - $ $ - 50 00 <br />4 B ! Maria. i Growth Needs 0 S S - S - $ - $0 00 <br /> o $ - s $ s - SD o0 <br />S Financiat Waler Plannm 0 $ $ $ S - $0 00 <br /> o s s - s s so oa <br />6 Steel Treated Water Stora Tank Constnrctior. Documents 0 $ S $ s - $D 00 <br /> 0 $ S_ - S _ S $000 <br /> 0 S $ - 5 $ - $0 00 <br /> - - , $0 OD <br /> 47 5 $ 5,340 220 $ 165 0 $ 0 $ $5.505 D6 <br />Total Hours 20 23 4 5 47 5 (as check) <br />- --- - -------- ---- -- TOTAL 55.505 DO <br />Labor Cost 2.700 2,415 225 $ 5,340 (as checkl <br />