My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Yampa - Sand Wash Coalbed Methane Production Depletive Effects on Water Resources Study_Contract
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Yampa - Sand Wash Coalbed Methane Production Depletive Effects on Water Resources Study_Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2012 9:25:46 AM
Creation date
5/21/2009 10:34:34 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Yampa/White
Applicant
Moffat County
Description
Sand Wash Basin Coalbed Methane Production Depletive Effects on Water Resources Study
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
150435
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Other Direct Costs <br />Item: Copies Materials Equipment/ Mileage Travel Total <br /> Supplies/ Lodging <br /> Samles and Per- <br /> Diem <br />Units: Samples Miles Days <br />Unit Cost: $30 $175 $0.52 $140 <br />Task 1 -Research CBM <br />Production and Water <br />Production <br />Task 2 -Characterize Basin <br />Stratigraphy and Structure <br />Task 3 -Characterize <br />Regional Ground Water <br />Flow S stems <br />Task 4 -Relate Target CBM <br />Intervals to Local Aquifers <br />Task 5 -Relate Target CBM <br />Intervals to Surface Water <br />Systems <br />Task 6 -Characterize Water <br />Quality of CBM Intervals, <br />Local Aquifers, and Surface <br />Water <br />Task 7 -Identify Areas <br />Where Data Are Insufficient <br />Task 8 -Devise Plan To Fill <br />Data Gaps <br />Task 9 -Collect Field Data $3,500 $1,508 $5,880 $10,888 <br />(Water Levels, Water <br />Samples, Aquifer Tests) <br />Task 10 -Depletion <br />Modelin <br />Task 11 -Report Preparation $750 $750 <br />Task 12 -Public Meetings $500 $560 $1,060 <br /> <br />Total Units: 25 20 2900 46 <br />Total Cost: $12,698 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.