Laserfiche WebLink
Budget <br />Total Costs <br /> Labor Other Direct Total Project Costs <br /> Costs <br />Task 1 -Research CBM $6,883 $6,883 <br />Production and Water Production <br />Task 2 -Characterize Basin $5,768 $5,768 <br />Stratigraphy and Structure <br />Task 3 -Characterize Regional $7,405 $7,405 <br />Ground Water Flow Systems <br />Task 4 -Relate Target CBM $4,041 $4,041 <br />Intervals to Local Aquifers <br />Task 5 -Relate Target CBM $1,840 $1,840 <br />Intervals to Surface Water <br />S stems <br />Task 6 -Characterize Water $3,647 $3,647 <br />Quality of CBM Intervals, Local <br />Aquifers, and Surface Water <br />Task 7 -Devise Plan To Fill Data $1,840 $1,840 <br />Gaps and Devise Plan to Fill Gaps <br />Task 9 -Collect Field Data (Water $22,747 $10,888 $33,635 <br />Levels, Water Samples, Aquifer <br />Tests) <br />Task 10 -Depletion Modeling $32,878 $32,878 <br />Task 11 -Report Preparation $15,052 $750 $15,802 <br />Task 12 -Public Meetings $6,036 $1,060 $7,096 <br />In-Kind Contributions $0 <br /> <br />Total Costs: $108,136 $12,698 $120,835 <br />10 <br />