My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Executive Summary
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150073 Executive Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:07 PM
Creation date
4/23/2009 10:05:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District - Water Activity Enterprise
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Evaluation of the Arkansas Valley Pipeline <br />W ater Works! Committee <br />July 2003 <br />Section 2 -Scope of Work <br />The project work tasks were divided into two phases. Phase 1 of the study was areconnaissance- <br />level review of water demands and potential opportunities for satisfying those demands via a <br />pipeline from the municipal outlet at Pueblo Reservoir. The primary question answered in Phase <br />1 was whether or not there are any "fatal-flaws" that would preclude further evaluation of the <br />pipeline. The fatal-flaws maybe technical or environmental related, rather than cost. During <br />Phase 2, the project was studied at the feasibility level, during which questions about cost and <br />institutional feasibility were addressed. <br />GEI Consultants, 1nC. T 01284 03-07-21 feasibilty report executive summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.