My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Executive Summary
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150073 Executive Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:07 PM
Creation date
4/23/2009 10:05:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District - Water Activity Enterprise
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Evaluation of the Arkansas Valley Pipeline <br />Water Works! Committee <br />July 2003 <br />Table of Contents <br />Section 1 -Introduction 1 <br />Background 1 <br />Service Areas and Project Participants <br />Authorization <br />Acknowledgements <br />2 <br />Z <br />Section 2 -Scope of Work 4 <br />Section 3 - Enaineerina Evaluation 5 <br />Pipeline Alignment Evaluations and Project Cost Estimates 5 <br />Water Treatment Evaluations and Project Cost Estimates 6 <br />Section 4 -Financial Evaluation 9 <br />Potential Funding Sources for the Arkansas Valley Pipeline 9 <br />Section 5 -Institutional Evaluation 13 <br />Section 6 -Conclusions 15 <br />Phase 1 15 <br />Phase 2 16 <br />Section 7 -Recommendations 17 <br />Section 8 -References 18 <br />GEI Consultants, 1nC. ~ 01284 03-07-21 feasibilty report executive summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.