Laserfiche WebLink
Table 1 <br />~ <br />Construction Items Ori . Est. Revised Est. Increase <br />1. Construction $641,000 $1,847,760 $1,206,760 <br />2. En 'neerin $14,900 $17,900 $3,000 <br />3. Contin ency $64,100 $434,340 $370,240 <br />Torals: $720,000 $2,300,OU0 $1,580,000 <br />One of the main cost overruns associated with the project was having to replace the entire diversion <br />structure. This required an additional 180 feet of diversion structure removal and replacement. <br />Additionally, the reconstruction, realignment, and installation of new Bladder Gates at the intake <br />structure also added a significant cost to the project. These items will cost the District an additional <br />$1,206,760 to complete. Finally, the engineer has budgeted $373,240 in contingencies and <br />engineering to account for the overall projected cost ovemzn of approximately $1,580,000. <br />The District is requesting an increase of $1,436,220 to its current loan authorizarion of $654,480 to <br />cover 90% of the total cost of the project. The new total amended loan amount for the District <br />would be $2,090,700 at its original interest rate of 2.25 % for 30 yeazs. The new annual payment <br />will be $106,248, which includes the 10% reserve requirement. The District's current loan of <br />$654,480 has an annual payment of $33,260. <br />~nancial Analysis <br />Table 2 is a summary of the financial aspects of the project. The CWCB loan will be repaid <br />from annual acreage assessments. The land currently assessed by the District is 19,177 acres. <br />• mma <br />Table 2. Financial Su <br />Total Pro'ect Cost $2,300,000 <br />CWCB Loan Arnount $2,070,000 <br />CWCB Loan Arnount (Includin 1% Service Fee) $2,090,700 <br />CWCB Loan Pa ent $96,589 <br />CWCB Loan Pa ent (Includin 10% Reserve) $106,248 <br />Previous Assessment er acre (2007) $46.58 <br />A roved 2008/9 Bud et Assessment er acre $46.58 <br />Annual Cost of Loan er acre-foot delivered (19,900 ac-ft.) $5.34 <br />Annual Cost of Loan er acre Assessed (19,177) $5.54 <br />Number of Acres Assessed 19,177 <br />Assessment Levy History / acre: 2009- $46.58; 2008 -$46.58; 2007 -$18; 2006 -$13; <br />2005 - $10; 2004 - $10. <br />`~, :, <br />Creditworthiriess: The District has three existing loans with the CWCB, summarized as follows <br />in Table 3: <br />Table 3 <br />Loan Amount Borrowed Balance Annual Pa ment <br />Em ire Res. - S illwa $723,950 715,000 $38,354 <br />Diversion Structure $2,090,700 $2,090,700 $106,248 <br />Em ire Res. - E. Dam $4,454, l 00 $4,454,100 $226,354 <br />Totals: $7,268,750 $7,259,800 $370,956 <br />