Bijou Irrigation District <br />September 18-19, 2007 <br />Agenda Item 18a <br />Pneumatic Spiflway Gate (Bladder Gate) structure, 7 feet high, and located immediately adjacent to <br />the ditch intake structure. Sheet piling and pipe piling will be used under the new concrete <br />structures for stabilization and erosion protection. <br />The Total Proje~t cost is estimated to be: <br />1. Engineering $ 14,900 <br />2. Construction 641,000 <br />3. Contingency (10%) 64,100 <br />TOTAL $720,000 <br />If the loan is approved, final design would be completed in July 2008, with start of construction in <br />August 2008 and completion at the end of September 2008. All easements and rights of way have <br />been arranged for. The District and the engineer expect that the project will be exempt form <br />Federal 404 permitting. <br />Financial Analvsis <br />The total estimated cost of the project is $720,000, and District water usage is 100% agricultural. <br />Staff is recommending a maximum loan amount of $648,000 (90% of the estimated project cost) for <br />30 years at an interest rate of 2.25%. The District will pay the additional 10% ($72,000) of the <br />project cost from reserve funds. The District will cover any costs that exceed the estimated project <br />cost. <br />Table 1 is a summary of the financial aspects of the project. A CWCB Loan of $648,000 would <br />have an annual payment of $32,931 (including the 10% reserve requirement} at the loan terms of <br />2.25% for 30 years. The CWCB loan will be repaid from increases in the acreage assessment <br />from $18.00 per acre to a minimum of $19.72 per acre. The annual loan cost for the project wi!{ be <br />$2.07 per acre-foot based on an annual delivery of 15,900 acre-feet to District irrigated lands. <br />Table 1. Financial Summary <br />Pro~ect Cost $720,000 <br />Number of Irri ators 157 <br />Number of Acres Assessed 19,177 <br />CWCB Loan Amount $648,000 <br />CWCB Loan Pa ment (inciudes 10% reserve $32,931 <br />Current Assessment er acre 2007 $18.00 <br />Re uired Assessment er acre with CWCB loan $19.72 <br />Annual Cost of Loan per AF delivered (15,900 ac-ft. $2.07 <br />Assessment Levy History: 2007 $18/acre 2005 $10/acre <br />2006 $13/acre 2004 $10facre <br />Creditworthiness: The District has one existing loan with CWCB, approved in May 2005 for <br />$672,660 with an increase to $723,950 in May 2007, with an interest rate of 2.5% for 30 years. <br />The loan was for construction of a new spillway and additional toe drains for Empire Reservoir. <br />This loan will have an annual loan obligation of $38,047 (including the 10% reserve requirement) <br />Table 2 shows the Financial Ratios and indicates overall average ability to repay the new $648,000 <br />CWCB loan, and the existing loan, with annual assessment raised from $18.00 to $ 19.72 per acre. <br />Page 4 of 5 <br />