My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02411
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 11:19:20 AM
Creation date
4/3/2009 12:02:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150289
Contractor Name
South Metro Water Supply Authority
Contract Type
Loan
Water District
0
County
Adams
Arapahoe
Douglas
Denver
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Metro Water Supply Authority <br />March 10, 2009 (UPDATED March 18, 2009) <br />Page 6 of 8 <br />Table 3. Borrower Summary <br />Agenda Item 14b <br />Member Firm Capacity Variable Capacity Cost <br /> (MGD) (MGD) <br />Arapahoe County Water and Wastewater 0 3.5 $2.6M <br />Authority (3,921 AF) <br />Meridian Metropolitan District .55 0 $0.8M <br /> (616 AF) <br />Pinery Water and Waste Water District .50 1.0 $1.SM <br /> (560 AF) (1,120 AF) <br />Stonegate Village Metropolitan District 0 1.0 $0.7M <br /> (1,120 AF) <br />Total (Fum x $1.SM/mdg) ( Variable x $0.75M/mgd) $5.6M <br />Note: Firm capacity is defined as the capacity available to members of the Authority at all times. Variable capacity <br />is the space ECCV owns in the pipeline but will not use during off-peak hours. During peak demand, ECCV will <br />likely use its entire allotted space. There will be times in the day, however, when ECCV is not using all of its <br />capacity and will allow other members of the Authority access to this space. <br />Financial Analysis <br />Table 4 shows a summary of the financial aspects of the loan request. Based on the median household <br />income of the Authority's members' service areas, a high-income municipal interest rate of 4.5% for a <br />30-year term will be used. <br />Table 4. Financial Summary <br />PROJECT/LOAN <br />Total Project Cost $25,700,000 <br />Project Cost for CWCB Loan Borrowers $5,600,000 <br />CWCB Loan (90% of Bonowers ortion) $5,040,000 <br />CWCB Loan (Including 1% Service Fee) $5,090,400 <br />CWCB Annual Loan Pa ent $312,500 <br />CWCB Annual Loan Obli ation (Includin 10% Reserve Funding) $343,800 <br />Current Number of Taps (served by all four borrowin members combined) 11,675 <br />Average Monthly Cost Per Tap for Project $2.45 <br />Creditworthiness: The Authority has no existing debt. The Authority will collect assessments from <br />Arapahoe County Water and Wastewater Authority, Meridian Metropolitan District, Pinery Water and <br />Wastewater District, and Stonegate Village Metropolitan District to cover the CWCB debt service and <br />reserve account. <br />
The URL can be used to link to this page
Your browser does not support the video tag.