My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02410
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 4:42:01 PM
Creation date
4/3/2009 12:01:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150288
Contractor Name
Deuel and Snyder Improvement Company
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
As mentioned before, the DSIC has had an average annual diversion <br />ot 4,590 acre feet for all water diverted into the Deuel and <br />Snyder Canal. Yearly diversions for the DSIC would be considered <br />fairly inconsistent. Variations in these numbers correspond to <br />the amount of rainfall during the irrigation season and overall <br />availability of recharge water. More rainfall in a certain year <br />meant that less water had to be diverted for irrigation that year <br />and vice versa. <br />Cost Estimate <br />The estimated total project cost is $100,000. Project planning <br />and engineering design will be provided by Nation Engineering <br />Se~vices, LLC. <br />~~ <br />Item Estimated Cost <br />1. Planning and Design Costs $ 2,800 <br />2. Construction Cost with Contingency $ 97,200 <br />Total Cost $100,000 <br />A more specific cost break down is as follows: <br />Item Estimated Cost <br />1. Earth Work $ 9,100 <br />2. Dewatering $ 8,300 <br />3. Demolition $ 8,000 <br />4. Concrete Work $ 33,400 <br />5. 5' Radial Gate $ 2I,000 <br />6. Gate Installation $ 1,200 <br />7. Contingency (20~) $ 16,200 <br />8. Planning and Design Costs $ 2,800 <br /> Total Cost $100,000 <br />Tmplementation Schedule <br />The following schedule is proposed for implementation of the <br />project: <br />Task Date <br />1. Complete Final Design 02/28/09 <br />2. Start Construction 03/I5/09 <br />3. Comple~e Construction 03/31/09 <br />4. Project is Operational 04/O1/09 <br />Feasibility Study <br />Deuel & Snyder Improvement Company <br />River Sand Gate Structure <br />February 2009 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.