My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150254 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150254 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:22:08 PM
Creation date
4/3/2009 10:48:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150254
Contractor Name
Hillrose, Town of
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7-76-07; 2~40PM: <br />;930389a2578 # 5/ i~ <br />CWCB Construction Fund Loan Applicafion _ <br />, ._~ <br />7. Please list the names, addresses and phone numbers of the A~pplicants' engineer(s) and <br />attomey(s). <br />8. List any feasibility studies or other investigations that ha.ve been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />appllCatloII. Rrent Natinn ~3rth Natinn Fn 'n ..ring, ~ rvi pc T.T.C has he~n hired tn c.nm=lete a <br />f aci iljt~r S~ji ~r <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimat~ <br />cvnstruction costs, if known. <br />Estimated Engineering Costs: $?? <br />Estirnated Construcrion Costs: $ <br />Estimated Other Costs: $5n n~ - (land acquisition, water rights purchase,etc.) <br />Estimated Total Costs: $~,S.,~N1n <br />I0. I.oan amount and terms you are requesting. <br />Requested Loan Amount: $ (Usually 75-90 % of Esk Total COSts) <br />Term (length} of loan: 3!) vT arc (Lisualty 10, 20, or 30 years) <br />Interest Rate: 3~1 % (Please cell for our current rates) <br />Part C. - Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The folIowing information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also reyuested that the project sponsor submit with this application, copies of the three most recent <br />annual reports, financial statements, corporate reports or other current docwmentation of financial <br />condition and opera.tions. <br />1. List any existing long-term liability (multi-year) or indebtedness that exceeds one thousand <br />dollars. For example, bank Ioans, govemment agency loans, bond issues, accounts payable, etc. <br />Include names and addresses of lenders, amounts, due dates and maturity dates. Attaeh a <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.