My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150254 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150254 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:22:08 PM
Creation date
4/3/2009 10:48:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150254
Contractor Name
Hillrose, Town of
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7-t6-07: 2:40PM: :930389a2578 # 3/ 77 <br />CWCB Construction Fund Loan AppIication <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach separate sheets if needed, and a <br />map of the service area. <br />Existing water supply: <br />(''~ce #'~xl~9f9 ~ V(~5951 and ~ charPC nf Tark~ RPCPVnir and 1/a chare nf Riv .rsid . R sevnir <br />anr~ 1 5 sh r c ~f i P•R an~ fi4 tan ern~ivalentc nf R~nrgan ("'n nalitv Water i)ictrict <br />rPCirlPnr. c Rr cnmmPr~ial sir~ctiires wnLd hn~k i~n t~ th~q~stem_ <br />Current Water Project: '~+P tnum ic in th middl nfa~_r~ectet~ ~1 7 millinn dnllar,~ec <br />thaf rnne'eta ~f a difal diGtrih ,'pn ,~ct~m, ~~nt~n~tahle cPrvice ~nviciPrl h3r thP Tnwn'c <br />PX~Stixlg ~~?1_1, anr~ ll~nrg~n C'nLn ~~nal~ Wat r T~ictriet nrnvrding the entirP indnnr nc~tahlP <br />cnsnrnl~(WP have nai~40,00n nf the ~7i R,7R4 n0 du . fnr fhe Fi4 t~n ~ivil~r. ants necescarv fnr <br />thgnnYahle indnnr water cnnnl~l A ne~u nntahle dictrih~~tinn Syetem wnnld he nnnetnSr.tP.ri anrl <br />tiec~ intn thP MC'C~~Syctem Tn nrder tn aclenuatP,]~, meet the Tnwn'c indnnr deman~, 1.5 <br />milec nf~ line in M(`(1W1~'c s~rstem nP,eds t. n~ ci7e.d frnm a h" tn an St" linP at the <br />Tnwn'~ ex~n~~A ~P~ line frnm MC'nWl~ wnnlr~ hP cnnstn~cted tn r~elive~ water tn a <br />r~ntralj,~ ahc-ve p nund etnragP tank T.n ing w~'ll he nrnvided nn thP nnrtinnc nf the ~yctem <br />that enTrentl~ havP "rlParl-endc", and the new ncitahlP cvctem tUni~ld ~nvide the. came lc-nnino: <br />Individual ~ptah~,~gervicec wrn~lci hP mPtPrPr~ Thic c,~rctPm has 141 usera whn arP alreadv <br />n~yin~,RS ner mnnth fnr rlPht cenrice nn thic nrniPrt <br />Operational problems: The t~wn neer~c tn numhace additinnal water rightc fnr ai~mentafinn <br />For existing facilities indicate~ <br />Number of shareholders or N~nber of customers serve <br />Current Assessment per share $55.40 per month $2.55 for Water Debt 1(CWCB first loan) <br />$22.85 for Water Debt 2(DWRF} and $30.00 per month user fee <br />Number of shares <br />Number of acres irrigated nLa WaEer Right: CFS. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.