My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPCONF.277T
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
WSPCONF.277T
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:08:35 AM
Creation date
3/2/2009 8:43:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Arkansas River Basin - Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1949
Author
DOI-BOR
Title
Interim Report - Gunnison-Arkansas Project - Colorado - Appendix C - Designs and Estimates - Volume III of XVI - Project Planning Report 7-8a-49-1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• C. J � �z C 3i?::rZ <br /> FISCAL YEARS <br /> - w TOTAL COST BALANCE ESTIMATED <br /> Z ACCOUNT FEATURE OR ACTIVITY QUANTITY UNIT ESTIMATED TO ONE TWO THREE FOUR FI9E six Sam TO COMPLETION z_ <br /> -' NUMBER COST JUNE 300 J A s J F A J J A sb o J J A F A J J A s N J J J s D J F , LsJ F A ) J A s o J J J A s N'D J r J COMPLETE DATE J <br /> 42) (3) (41 - (5) (6) (7) (81 (91 (10) (11) (12) (1 ( 14) (15) (16) (17) <br /> 1 14003 TRANSMISSION SYSTElf AND CONTROL 336 Mi. 8,238,000 1000 1100 1 500 15S? 1 A1 1,200 1 <br /> 2 16.01 FERUNW CAI[P AT GRANITE 596,000 325272 - 2 <br /> a 16002 CARETAURSI MIDEBCES, GARAG$3 87.000 1 t I I I I I I I I I I I I I I I I I I 1 58 �9 3 <br /> UT <br /> i 43 251 <br /> 4 16.03 WARMoU31S 294 000 1 1 1 1 1 1 1 T I 1 4 <br /> s 17-01 CONSTRUCTION CAJIFS 1 922,000 176 369 341 36 5 <br /> 6 17,02 CONSTRUCTION OFFICE AND LABORATORL 88,000 6 <br /> 7 RECREATION 157,000 <br /> 80 1 77 7 <br /> ADDITIONAZ. FACILITIES FOR <br /> 8 jCTP r 11A9.688o00 4,688 e <br /> . a <br /> . 9 OPERATION AND NAINTBNANCR DURING CONST1 CIMIN 691 000 41 150 200 300 9 <br /> 10 10 <br /> - <br /> TOTALS $144241,000 2 000 22 000 000 36 0-ITT 23�000 r 19 900 6,241 11 hl i 1 �. <br /> 12 12 <br /> 13Jill 13 <br /> r III <br /> }, 14 ► 14# k <br /> • �r <br /> is <br /> 15 15 r <br /> 16 16 . . <br /> r <br /> 17 17 <br /> 18 •. <br /> • Q �j i 9 19 <br /> 20 <br /> 4 <br /> 3 zt 21 <br /> 21 22 <br /> 23 23 <br /> ?4 24 <br /> 2` 25 <br /> 26 k 26 <br /> 27 27 <br /> 28 28 <br /> 29 29 <br /> 30 30 <br /> 31 31 <br /> 32 � 32 <br /> 33 33 <br /> Notes. UNITED STATES <br /> a/ Construction costs in units of 4000 doUarso Recommended: DEPARTMENT OF THE INTERIOR j <br /> (Project Engineer) (Date) BUREAU OF RECLAMATION <br /> Recommended: _ CONTROL SCHEDULE <br /> (Regional Director) ___ ( at— e — FOR THE <br /> Recommended: <br /> (Director, Programs 6 Finance) (Data) INITIAL DEV$LOFYI3NT, _ <br /> GUNN3SaF*ABKAN SO <br /> — <br /> PROJECT PROJECT OR UNIT <br /> Approved: — — — — — <br /> (Commissioner) (Date) tROJE :T © DESIGN A ❑ SPECIAL <br /> PLANNING CONSTRUCTION <br /> • Revised:, SHEET__?_ OF__ -?.SHEETS _ PUSBLA�-COLORADO _ _____ JUIS 21J949-- - - _ <br /> (Date)--- - OFFICE ----- DATE II[GtOM _ <br /> 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.