My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Elkhead Reservoir Final Acquisition Agreement
CWCB
>
Instream Flow Acquisitions
>
DayForward
>
Elkhead Reservoir Final Acquisition Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:58:53 PM
Creation date
2/26/2009 12:49:41 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
02CW0106
Stream Name
Yampa River
Watershed
Yampa River
Water Division
6
County
Routt
Instream Flow Acq - Doc Type
Contracts,MOA/MOU,Leases,Agreements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 12 <br />Reclamation, the Service, and'or CVVCB for the non-payment of amounts owed for <br />O~VI&R costs. Any parry, together with the State of Colorado, shall have the right to <br />provide replacement funds to pay OM&R charges due and owing the River District. <br />F. In the event that the River District transfers control over operations, maintenance, <br />and repair of the Reservoir Enlargement to Craig, the River District shall concurrently <br />receive from Craig an acknourledgment of Craig's agreement to abide by the terms of <br />this Reservoir Enlargement Agreement. <br />G On account of drought, errors in operation, operational constraints imposed by the <br />State of Colorado or otherwise, or other causes, there may occur at times a shortage <br />during any year in the quantity of water available to be stored within the Reservoir <br />Enlargement, and in no event shall any liability accrue against the parties hereto for any <br />damage direct or indirect, arising therefrom. In any year in which there may occur such a <br />shortage in the Reservoir Enlargement water supply, Reclamation shall continue to be <br />obligated to pay OM&R as provided in paragraph IV.B herein. <br />`'. Fish Screen <br />The parties acknowledge that the cost estimates contained in the Reservoir Enlargement <br />Cost of Construction, the Recovery Program Obligation, and the River District Obligation do not <br />include the cost of installing a permanent fish screen on the Reservoir Enlargement spillway or <br />outlet tube for the purpose of preventing non-native fishes from escaping from the Reservoir <br />Enlargement into the Yampa River. The parties further acknowledge that the capital costs of <br />installing a permanent fish screen, and incremental OM&R costs of operating, maintaining and <br />repairing a fish screen, are in addition to the Recovery Program Obligation and the Recovery <br />Program's OM&R obligations described in this Reservoir Enlargement Agreement. The capital <br />costs of installing a permanent fish screen and the incremental OM&R costs associated with a <br />fish screen shall not be borne by the River District, Craig, nor included in the annual service <br />charge imposed on the Yampa Participants. <br />VI. Proceeding to Make Absolute <br />After the u-ater right for the Permanent V~'ater Supply is placed to beneficial use for <br />piscatorial and recreational uses (including in-river fish habitat and river flow maintenance and <br />enhancement uses, and uses in furtherance of the Recovery Program) and the Recovery Program <br />Obligation has been paid in full, the River District, after consultation with the parties hereto shall <br />submit the necessary pleadings in the Water Court for Division No. 6 in the name of the River <br />District and prosecute the case to make absolute those conditional water storage rights. <br />
The URL can be used to link to this page
Your browser does not support the video tag.