My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Elkhead Reservoir Final Acquisition Agreement
CWCB
>
Instream Flow Acquisitions
>
DayForward
>
Elkhead Reservoir Final Acquisition Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:58:53 PM
Creation date
2/26/2009 12:49:41 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
02CW0106
Stream Name
Yampa River
Watershed
Yampa River
Water Division
6
County
Routt
Instream Flow Acq - Doc Type
Contracts,MOA/MOU,Leases,Agreements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 5 <br />water stored behind the Dam Enlargement shall include water stored pursuant to water <br />storage rights decreed for the existing Elkhead Reservoir as well as any water stored <br />pursuant to additional v~Tater storage rights adjudicated and decreed for storage in the <br />Reservoir Enlargement. The Reservoir Enlargement will have a total estimated capacity <br />of 24,887 acre-feet. <br />Permanent «Tater Supply -shall consist of the CWCB's ownership interest in the storage <br />space in the Reservoir Enlargement and the CWCB's ownership interest in the water <br />storage rights decreed to fill the Reservoir Enlargement as described in paragraph II.A <br />herein. <br />Pn~ -shall mean the relative seniority of the v~~ater rights held by, or that maybe <br />acquired or adjudicated by, Craig, the River District, or the Yampa Participants for the <br />Reservoir or Reservoir Enlargement as decreed by a court of the State of Colorado. <br />Pro-Rata Formula -shall mean the allocation of the storage space created by the <br />construction of the Reservoir Enlargement, estimated to be 11,750 acre-feet, as follows: <br />27i'47tI` interest (6,750 acre-feet) to the River District and 20/47` interest (5,000 acre-feet) <br />to the C`'~'CB for Recovery Program purposes. The Pro-Rata allocation is based on the <br />percentage contributions of the parties to fund the total costs related to the construction <br />of the Reservoir Enlargement as well as the long term costs of the Reservoir's operation, <br />maintenance and repair allocated to the Reservoir Enlargement. In the event that the <br />actual percentage contributions of the parties to fund the total costs related to the <br />construction of the Reservoir Enlargement differ from the 27/47th and 20/47th <br />relationship described herein, then the Pro-Rata Formula shall be adjusted in accordance <br />with the terms of paragraph II.B herein. Pro-Rata does not refer to or mean the amount <br />of water actually stored in the Reservoir Enlargement at any specific time. <br />Reco~Te Program Obligation -shall mean the obligation of the Recovery Program, <br />through Reclamation with and through the State of Colorado, to fund the Recovery <br />Program's Pro-Rata share of the Reservoir Enlargement Cost of Construction. The <br />Recovery Program Obligation is estimated at $8,722,888.00. The amount of the <br />Recovery Program Obligation maybe adjusted pursuant to the terms of paragraphs II.B <br />and III.A.l herein. <br />Reservoir Enlargement Cost of Construction -shall include costs related to: actual <br />construction costs, land acquisition costs, permitting costs, engineering costs, <br />construction contract administration costs, construction management costs, and water <br />rights adjudication costs. The Reservoir Enlargement Cost of Construction is estimated to <br />be X20,498,787.00. <br />Reservoir Operation, Maintenance and Repair "OM&R"- shall mean the day-to-day <br />control and operation and the reasonable and necessary maintenance, and/or repair, <br />I''OO~~.Clients~Ri~-er District3l-Elkhead-10?8'~~~-eements~Resenoir Enla cement Agreement final.wpd <br />Januan 6.200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.