My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DAM EMBANKMENT <br />EMBANKMENT: The Cactus Park Dam would be an earth structure and <br />would be a jurisdictional intermediate Class I dam. The "Rules and <br />Regulations for Dam Safety and Dam Construction" prepared by the <br />Colorado State Engineer, Division of Water Resources, state the <br />following criteria should be met: <br />* a minimum of 5 feet of freeboard, <br />* an outlet pipe capable of draining the top 5 feet of storage <br />in 5 days, <br />* a crest width equal to the vertical height divided by 5 plus <br />10 feet, maximum of 25 feet, <br />* a spillway capable of passing 100$ PMP, <br />* upstream rip rap to protect the embankment, <br />* and soils investigation and analysis. <br />Plans and specifications must be prepared and approved by the State <br />Engineer prior to beginning construction. USBR has performed most, <br />if not all, of the field testing necessary to design the dam. The <br />reconnaissance designs described herein are based upon data <br />contained in the PRC report; more detailed engineering work may <br />result in a different design. <br />The proposed dam is planned to be a zoned earthfill structure with <br />3.OH:1.OV upstream and 1.75H:1.OV downstream slopes with a 30 foot <br />wide crest (Western Engineers report). It is assumed that the PRC <br />report used the same preliminary design. For the proposed capacity <br />of 15,900 acre-feet the dam height would be about 170 feet with an <br />embankment volume of about 3,400,000 cubic yards (PRC report). <br />The spillway and outlet works are not described in the PRC report. <br />RELATED STRUCTURES: The PRC report described: <br />(1) The Surface Creek Feeder canal to collect and convey water from <br />streams and irrigation return flow to Cactus Park Reservoir. The <br />canal would be about 7.7 miles long and vary in capacity from 80 <br />cfs to 200 cfs. <br />(2) The Cedaredge Canal would convey reservoir releases to various <br />points in the irrigated area. The canal would be 10.2 miles long <br />with a capacity varying from 50 cfs to 150 cfs. <br />Cactus Park Dam 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.