Laserfiche WebLink
DAM EMBANKMENT <br />EMBANKMENT: The Cactus Park Dam would be an earth structure and <br />would be a jurisdictional intermediate Class I dam. The "Rules and <br />Regulations for Dam Safety and Dam Construction" prepared by the <br />Colorado State Engineer, Division of Water Resources, state the <br />following criteria should be met: <br />* a minimum of 5 feet of freeboard, <br />* an outlet pipe capable of draining the top 5 feet of storage <br />in 5 days, <br />* a crest width equal to the vertical height divided by 5 plus <br />10 feet, maximum of 25 feet, <br />* a spillway capable of passing 100$ PMP, <br />* upstream rip rap to protect the embankment, <br />* and soils investigation and analysis. <br />Plans and specifications must be prepared and approved by the State <br />Engineer prior to beginning construction. USBR has performed most, <br />if not all, of the field testing necessary to design the dam. The <br />reconnaissance designs described herein are based upon data <br />contained in the PRC report; more detailed engineering work may <br />result in a different design. <br />The proposed dam is planned to be a zoned earthfill structure with <br />3.OH:1.OV upstream and 1.75H:1.OV downstream slopes with a 30 foot <br />wide crest (Western Engineers report). It is assumed that the PRC <br />report used the same preliminary design. For the proposed capacity <br />of 15,900 acre-feet the dam height would be about 170 feet with an <br />embankment volume of about 3,400,000 cubic yards (PRC report). <br />The spillway and outlet works are not described in the PRC report. <br />RELATED STRUCTURES: The PRC report described: <br />(1) The Surface Creek Feeder canal to collect and convey water from <br />streams and irrigation return flow to Cactus Park Reservoir. The <br />canal would be about 7.7 miles long and vary in capacity from 80 <br />cfs to 200 cfs. <br />(2) The Cedaredge Canal would convey reservoir releases to various <br />points in the irrigated area. The canal would be 10.2 miles long <br />with a capacity varying from 50 cfs to 150 cfs. <br />Cactus Park Dam 6 <br />