Laserfiche WebLink
A soil cement cutoff wall perpendicular to the flow of water is <br />included to stabilize the spillway section. Rip rap would be <br />placed on the left side of the spillway. <br />The method to convey water from the ditch into the reservoir was <br />not addressed in the Corp report. Possible methods include <br />pumping, construction of a higher elevation ditch, or an inlet pipe <br />into the dam. Since the dam is not considered financially feasible <br />as presently planned, a solution to this problem. was not formulated <br />herein. <br />Bootleg Dam 7 <br />