My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A soil cement cutoff wall perpendicular to the flow of water is <br />included to stabilize the spillway section. Rip rap would be <br />placed on the left side of the spillway. <br />The method to convey water from the ditch into the reservoir was <br />not addressed in the Corp report. Possible methods include <br />pumping, construction of a higher elevation ditch, or an inlet pipe <br />into the dam. Since the dam is not considered financially feasible <br />as presently planned, a solution to this problem. was not formulated <br />herein. <br />Bootleg Dam 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.