My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 5 <br />BIG BATTLEMENT DAM AND RESERVOIR <br />FINANCING OPTIONS <br />Construction Interest <br />Option Cost Estimate Rate Years <br />1 $348, 000 3.5% 20 <br />Annual <br />Annual Cost per <br />Cost Acre-Foot <br />$24,486 $30 <br />2 $348, 000 4.0% 30 $20,125 $25 <br />3 $348,000 3.5% 15 $30,215 $37 <br />4 $348,000 3.5% 10 $41, 844 $51 <br />Volume of Reservoir Storage in Acre-Feet: <br />816 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.