My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02306
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:11 AM
Creation date
2/17/2009 10:42:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150280
Contractor Name
Park Center Water District
Contract Type
Loan
Water District
0
County
Fremont
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Loan Apulication <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />Any existing operational or maintenance problems. Attach separate sheets if needed, and a <br />map of the service area. Failure of Park Center Well,~rimary raw water source. See <br />service area ma followin <br />For existing facilities indicate: <br />Number of shareholders N/A or Number of customers served 1400 taps/4000 customers <br />Current Assessment per share $ N/A Number of shares <br />Number of acres irrigated N/A Water Right: N/A CFS. <br />Average water diverted per year: N/A acre-feet. <br />Part B. -Description of the Project <br />1. Name of the project facility Redrillin of the Park Center Well <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabitation or replacement of existing facility <br />Enlargement of exiting facility <br />X_ Emergency Repair (replacement of well) <br />Other (describe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES i NO N/A <br />4. General location of the project. (Please include county, and approximate distance from <br />nearest town, as well as legal description, if known. Fremont County approximately <br />4 miles north of Canon City. See legal description and map of the area following this page. <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />Area residents have been purchasing well water from the BLM~actual owners of the well) <br />since 1937., first for irrigational use and them since 1968, for their domestic water sunnly <br />throu~,h Park Center Water District. The District is dependent on this water supply during <br />the winter months when surface water is unavailable and during times of drought. See <br />followinp~charted well usage for past 8 years, noting that the well water is used to serve <br />District residents every year and is augmented in the drou fight years of 2002, 2003, and <br />2004. See well usage table. <br />
The URL can be used to link to this page
Your browser does not support the video tag.