My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02306
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:11 AM
Creation date
2/17/2009 10:42:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150280
Contractor Name
Park Center Water District
Contract Type
Loan
Water District
0
County
Fremont
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES NO X_ <br />If YES, please explain <br />N/A <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney (s). <br />NAME: <br />Pat O'Brien, P.E. and Scott Medford <br />Paul Summers, Hydrogeolog~~ <br />Layne Christensen Company (drillers) <br />Larry D. Allen , Attorney <br />ADDRESS and PHONE: <br />Hvdrokinetics, Inc. <br />12975 West 24a` Place. Golden. CO 80401 <br />X303)237-9965 <br />BLM~3170 E.Main. Canon Cit~(719) 269-8500 <br />17800E 22~ Ave. Aurora, CO (303)755-1281 <br />P O Box 166 Canon Citv CO 81215 (719) 275-7593 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Bureau of Land Management enaineer's feasibility study, Layne Christensen <br />statement of feasibility, following pages. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />Construction costs, if known. (See Layne Christensen Proposal, following) <br />Estimated Engineering Costs: $ <br />Estimated Construction Costs $ $1.2-$1.5 Million <br />Estimated Other Costs: $ (land acquisition, water rights, etc. <br />Estimated Total Costs: $ $1.2-$1.5 Million <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $_$1. million (Maximum 75-90% of Est. Total Costs) <br />Term (length) of loan 30 wears (usually 10,20, or 3o years) <br />Interest Rate 3.5% (Please call for our current rates) <br />Part C. -Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the financial capacity to repay any loans made by the CWCB. The following <br />information is needed to assist the CWCB in a preliminary assessment of the applicant's <br />capacity. It is also requested that the project sponsor submit with this application, copies of the <br />three most recent annual reports, financial statements, corporate reports or other current <br />documentation of financial condition and operations. See following, annual audits 2005-2007 <br />most current income statement balance sheet,...projected revenues and expenses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.