My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG Opinion
CWCB
>
Instream Flow Rules
>
DayForward
>
AG Opinion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2009 1:55:31 PM
Creation date
2/12/2009 11:27:09 AM
Metadata
Fields
Template:
Instream Flow Rules
Year
2009
Instream Flow Rules - Doc Type
Post Rulemaking Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
At any time Staff verifies that an ISF water right is not being fulfilled as a result of water use against which <br />the ISF 4vater right is entitled to protection, the Staff shalt provide Proper Notice, including a description of <br />what the Board is doing in response to the situation. <br />9. MODIFICATION OF ISF RIGHTS. <br />The Board may modify any existing decreed ISF right according to the procedures set forth in this Rule. <br />`Modification" of an ISF right within the meaning of this Rule includes a decrease in the rate of flow <br />described in the existing ISF decree. segmenting an existing ISF reach into shorter reaches with the <br />result of decreasing the rate of flow in any portion of an ISF reach. or subtracting water from an ISF right <br />during any particular time period or season. <br />9a. Need for Modification. <br />Modification may be requested by the Staff or by any Person ~vho has filed a water right application on an <br />ISF reach or ~r:ho has applied for any governmental permit for facilities located in or near an ISF reach <br />and ~~~ho complies ~rrith Rules 9b. and 9c. Any request for modification. except by staff, shall be made in <br />v~~riting. submitted to Staff and such writing shall contain the following information: <br />~1 ~i name. address and telephone number of the Person seeking modification: <br />~2: strum or lake subject of request: <br />(3 - m~^~fi~~~r; '2quested: <br />~4- r~as~n `~r modification: and <br />lb the s~ertific data supporting the request. <br />9b. Need for Water. <br />Any Person ~,r~ho requests a modification of an ISF right must, as a precondition to the Board's <br />consideration of the request. establish a need for the water made available by the modification. Staff does <br />not have to comply with this rule and any governmental entity seeking to implement the terms of an <br />agreement specified in Rule 9f. does not have to comply with this section- <br />9c. Grounds for Modification. <br />No request for modification may be considered until the applicant establishes that one of the following <br />reasons for modification exists: <br />(1) Mistake. <br />An ISF right may be considered for modification if the requesting Person establishes that an error was <br />made in the calculations upon which the original or supplemental appropriation or enlargement to an <br />original appropriation was made. <br />(2) Excessive Flow. <br />An ISF right may be considered for modification if the requesting Person establishes that the ISF flow rate <br />is in excess of the amount of water necessary to accomplish the purpose of the original, supplemental or <br />enlarged ISF right when that right was appropriated. <br />9d. Recovery Implementation or Other Intergovernmental Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.