Laserfiche WebLink
(1 '/erify the quanti caIion of the historical ccnsumotive use of the acquired ~avater right: <br />t2 ~Ierify the identification. ~uantificatior: and Iccatior~ cf return flo~~~s available for ISF use to <br />the extent that no in"ur- r,~ill result to vested ~:r~ater ri hts and decreed conditional water ri hts: <br />r33 Include terms and conditions providing that: <br />(a? The Board or the seller, lessor. lender. or donor of the .A~ater rr'aL- bring abut the <br />beneficial use of tl'e historical consumpti~de use of the chap ed water right downstream cf <br />the ISF reach as fully consumable reusable water" subject to such terms and conditions <br />as the ~frater court deems necessar" tc prevent in"u • to vested grater ri hts ar'id decreed <br />conditional water rights: and <br />b` v'Uhen the Board has rot ideritfed such downstream benefcial use at the time of the <br />than e of 4~rater ri rit. the Board ma amend the sub"ect chance decree. "rf re aired b=- <br />the Division En cineer. to add such bene icial uses s of the historical consumotive use <br />do~rYnstream of the ISF reach at the time the Board is able ie brnq about such use cr <br />reuse. ~,rrithout re^uiriny recuantification of the ~ri~inal historical consumptive use <br />calculatnr:: <br />and <br />(4; Determine the method b=: which the historical consumptive use should be quantified and <br />credited dtarin the term of the a reement for the lease or lean of th e ~.vater ri ht ursuant to <br />secton 3'-92-102(3`. C"R.S. <br />6i€. Limitation on Acquisitions. <br />The Board may not accept a donation of water rights that ~~ere acquired by condemnation. or that would <br />require th}e/~rYe~ moval}of ~exi(.s}t~i+ng infrastruc/t~u!re with.,out ap~pproval of the current owner of such infrastructure: <br />{3f''__a'_d~~'a•Y'R'Vl-r`Gf-',~Yi~'.'l'e~--T'i°yPy"C:7-_t9'1a°-_'__?~~e~e'a~.~i"~y,::E~r'~G7'_`~".i'_9~"~l__vF^__i{~e8`o"~{~'G1-ti ~4 ". <br />6k~. Temporary Loans of Water to the Board. <br />The Board may accept temporary loans of water for instream flow use for a period not to exceed 120 <br />days in any one year, in accordance with the procedures and subject to the limitations set forth in section <br />37-83-105, C.R.S. <br />(1) Within 5 working days after receiving an offer of a temporar~r loan of water to the Board for <br />temporary instream flow use, the Director will provide a response to the proponent and,= --'unless <br />the proposed loan has no potential value for instream flow use, staff will coordinate with the <br />proponent on preparing and submitting the necessary documentation to the State and Division <br />Engineers required by sections 37-83-105(2)(a)(I) and (2)(b)(I), C.R.S., and providing the public <br />notice required by section 37-83-105(2)(b)(II), C.R.S. <br />(2) Provided that the State Engineer has made a determination of no injury pursuant to section 37- <br />83-105(2)(a)(III), C.R.S., the Board hereby delegates authority to the CWCB Director to accept <br />tempcrar~,r loans of water for instream flow use in accordance with the procedures and subject to <br />the limitations set forth in section 37-83-105 and to take any administrative action necessary to <br />put the loaned water to instream flow use. <br />3. ~^ ~~ ~^c°^~ ~°^t ~~°~rr °~~' ~ Provided that the State Engineers determination of non-injury is still <br />in effect, the Director shall notify the proponent and the State Engineer whether the temporary <br />loan is to be exercised in subsequent years. Such notification shall be provided within 5 working <br />days of the Director being notified by the proponent that the water is available for use under the <br />