My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Administrative Record 12-22
CWCB
>
Instream Flow Rules
>
DayForward
>
Administrative Record 12-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2009 12:59:13 PM
Creation date
2/11/2009 5:30:29 PM
Metadata
Fields
Template:
Instream Flow Rules
Year
2009
Instream Flow Rules - Doc Type
Rulemaking Hearings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ISF Rule 8i.(3) -Injury With Mitigation <br />(Changes to July 2008 Draft shove n in bold) <br />September 8, 2008 Draft <br />the potentiail~,~ affected 1SF ~~-ater riUht. and to llliti~ation <br />alternati~-es: <br />i ~~=ailabilit~~ of on-site miti~~ation alternati~-es: <br />ii Technical feasibilit~~ of each alternati~-e: <br />iii En~-irolunental benefits and consequences of each <br />altelnati~-e: <br />1-i-i•i~- Economic belletit5 and consequences of each <br />altel7lati~-e: <br />~~- Reasonableness of alternati~-es: and <br />~=i F~~r Initiation alternati~-e5. ~t-hether the miti~atioll <br />«-as or ~z-ill be put in place to 5atisf~- a requirement <br />or need unrelated to the injure «-it11 mitigation <br />proposal. <br />• <br />~k~ The Board ~~~ill consider mitigation on a dilferznt reach of <br />stream or another stream t`'off--site mitigation-`) as a last <br />rzsol-t and ~~-i11 on1~- consider miti~iation in an area other <br />than the affected stream reach if no reasonable alternati~~e <br />exists for mitigation on the affected stream read:. The <br />Board onl~• ~~°ill consider off-site miti~~ation on stream(s) <br />located in the same draina~4e as the affected stream. <br />Factors that the Board ma~~ consider in lool;ill~ at such a <br />proposal include. but are not limited to. the de~Tree and <br />frequznc~- of Impact to the affected stream: t11e <br />ens,-ironlrental benefits provided to the off-site stream b~- <br />the mitigation: «-11ether the proposal could, in effect. <br />constitute a Illodiflcatlt~il of the ISF ~z•ater ri~llt on the <br />affected stream: car ~;~hether thz proposal could result in thz <br />Di~°ision of ~?4'ater Resources being unable to ~roperi~- <br />administer the affected ISF «-ater right(s) in accordance <br />«~ith the priol-it~= s~~stelll or «-it11 Colorado ~~-ater la~~-. <br />(1_) Stipulations and ~~°atel- court decrees that incorp~~rate injury= <br />~~-ith miti~atio n shall include. but not be limited to illclusit~n <br />of. t11e folio«=ink terms and conditions: <br />i _~ nro~-isit~n that the nrouollent ti~°ili not dig=ert e=ater <br />• <br />or take aII~- other action that «-ould reduce fl~~«-s in <br />the affected stream belolz- the decreed ISF amount <br />until the agreed-upon Ilutl~atlon measures are in <br />place and full= operational: <br />ii ~ requirement that the structural components of the <br />mitigation be maintained pennanentl~-; <br />iii ~ ~~ro~°i5ion allo~~°in~ Ct~~CB or D4~'~' staff access <br />to the propem~ on :~:•hich structural components of <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.