Laserfiche WebLink
ATTACHMENT A ;~~ ~ ~ / 3 <br />$607.,863.50 <br />(•ON I'll n("I' ~ <br />THIS CONTRACT, made This 1st d;,y „I' December - 19'8 z, by and between the <br />Sl ale of Culnradu li,r the uu• :nut bcnelil of liu• Ik• rlrl n,cul of '' Natural Resources <br />_(Colorado Water Conservation )~oard) , -- - ---~ <br />hrrrinaller n•Icrn•tl lu ;IS the Sl:dc •n,d •1 the Town Of Frulta <br />P. O. Box 638, Fruita, Colorado 81521, ----------- <br />hrn•inafli•1 rol~•rn•d lu a, Ibr coulraclnr, ~--. - - - .. - ~- <br />1VIIL•RLAS, aulhuriry c>,isls in the I.:IN~ :u,d Funds have bccu budgeted, appropriated and otherwise made <br />available and a +ulficieul unencumbered balance Ihen•nf rcmains:rvailable fur paYmeul in fund N'umhel9..048_, <br />(:/I. ~lceounl Numbl•r5.356X .. (~Illlral•I I':ucumbr:wee Nlnnbl•I(~~r~j,~%~.::wd <br />ABL Account Number ].356eT? Orel. llniC %7-77-777, <br />N'111.ItI.Ati. n•yun.'J approval. elear:uu'r :uul ruurdinaluni Ila, becu a..umpll,hrJ Ininl anJ wllh :y~luupu:~ly <br />iu'ucicx: and <br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended, the State is authorized to <br />construct certain water projects for the benefit of the people <br />of the State; and <br />WHEREAS, the Contractor is a town in the State of Colorado <br />and wishes to improve its present water supply system, <br />hereinafter called the project, for the citizens of Fruita <br />in Mesa County, Colorado, at an estimated cost of One Million <br />Two Hundred Thousand Dollars (51,200,000); and <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that sue roject is economically <br />feasible; and <br />WHEREAS, the State has construct said project and <br />to sell the same to the Contractor u t lly agreeable <br />terms and conditions, subjec t a a la 1'ty of funding <br />for that purpose; and <br />WHEREAS, pursuant t Hate Aill No. 439, Fifty-Third <br />General Assembly of the State of Colorado, duly enacted into <br />law, the Colorado Water Conservation Board has been authorized <br />to expend a sum not to exceed Eight Hundred Fifty Thousand <br />Dollars ($850,000) for construction of the project; <br />NOW THEREFORE, in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br />A. The Contractor agrees that it shall: <br />1. Employ an engineering firm to prepare project plans <br />and specifications for the proposed project. Both the <br />engineering firm and the project plans and specifications shall <br />be approved by the State. <br />2. Subcontract the construction of said project to a <br />responsible and capable firm, said project to be completed <br />within two (2) years of the date of this contract in accordance <br />with the project plans and specifications and any necessary <br />modification thereof approved by the State. The State must <br />approve, in writing, all subcontracts before they become <br />effective. The above-mentioned time may be extended by the <br />State if such time is insufficient bscause of acts of God cr <br />other acts or circumstances beyond the control of the <br />Contractor. <br />3. Require all Subcontractors L•o indemnify the State and <br />the Contractor against all liability and loss, and against all <br />claims and actions based upon or arising out of damage or <br />ern, ~~~ ul culu <br />I'a~c I of_Z pales <br />~ISr~• ~~„u~~~~l~~~~~, ~~~~ „•~,•~„•..I I:~al pagc.l 1 02 <br />fruita/2 <br />ATTACHMENT A <br />