ATTACHMENT A ;~~ ~ ~ / 3
<br />$607.,863.50
<br />(•ON I'll n("I' ~
<br />THIS CONTRACT, made This 1st d;,y „I' December - 19'8 z, by and between the
<br />Sl ale of Culnradu li,r the uu• :nut bcnelil of liu• Ik• rlrl n,cul of '' Natural Resources
<br />_(Colorado Water Conservation )~oard) , -- - ---~
<br />hrrrinaller n•Icrn•tl lu ;IS the Sl:dc •n,d •1 the Town Of Frulta
<br />P. O. Box 638, Fruita, Colorado 81521, -----------
<br />hrn•inafli•1 rol~•rn•d lu a, Ibr coulraclnr, ~--. - - - .. - ~-
<br />1VIIL•RLAS, aulhuriry c>,isls in the I.:IN~ :u,d Funds have bccu budgeted, appropriated and otherwise made
<br />available and a +ulficieul unencumbered balance Ihen•nf rcmains:rvailable fur paYmeul in fund N'umhel9..048_,
<br />(:/I. ~lceounl Numbl•r5.356X .. (~Illlral•I I':ucumbr:wee Nlnnbl•I(~~r~j,~%~.::wd
<br />ABL Account Number ].356eT? Orel. llniC %7-77-777,
<br />N'111.ItI.Ati. n•yun.'J approval. elear:uu'r :uul ruurdinaluni Ila, becu a..umpll,hrJ Ininl anJ wllh :y~luupu:~ly
<br />iu'ucicx: and
<br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado
<br />Revised Statutes 1973, as amended, the State is authorized to
<br />construct certain water projects for the benefit of the people
<br />of the State; and
<br />WHEREAS, the Contractor is a town in the State of Colorado
<br />and wishes to improve its present water supply system,
<br />hereinafter called the project, for the citizens of Fruita
<br />in Mesa County, Colorado, at an estimated cost of One Million
<br />Two Hundred Thousand Dollars (51,200,000); and
<br />WHEREAS, a feasibility investigation of said project was
<br />conducted and it was found that sue roject is economically
<br />feasible; and
<br />WHEREAS, the State has construct said project and
<br />to sell the same to the Contractor u t lly agreeable
<br />terms and conditions, subjec t a a la 1'ty of funding
<br />for that purpose; and
<br />WHEREAS, pursuant t Hate Aill No. 439, Fifty-Third
<br />General Assembly of the State of Colorado, duly enacted into
<br />law, the Colorado Water Conservation Board has been authorized
<br />to expend a sum not to exceed Eight Hundred Fifty Thousand
<br />Dollars ($850,000) for construction of the project;
<br />NOW THEREFORE, in consideration of the mutual and
<br />dependent covenants herein contained, it is agreed by the
<br />parties hereto as follows:
<br />A. The Contractor agrees that it shall:
<br />1. Employ an engineering firm to prepare project plans
<br />and specifications for the proposed project. Both the
<br />engineering firm and the project plans and specifications shall
<br />be approved by the State.
<br />2. Subcontract the construction of said project to a
<br />responsible and capable firm, said project to be completed
<br />within two (2) years of the date of this contract in accordance
<br />with the project plans and specifications and any necessary
<br />modification thereof approved by the State. The State must
<br />approve, in writing, all subcontracts before they become
<br />effective. The above-mentioned time may be extended by the
<br />State if such time is insufficient bscause of acts of God cr
<br />other acts or circumstances beyond the control of the
<br />Contractor.
<br />3. Require all Subcontractors L•o indemnify the State and
<br />the Contractor against all liability and loss, and against all
<br />claims and actions based upon or arising out of damage or
<br />ern, ~~~ ul culu
<br />I'a~c I of_Z pales
<br />~ISr~• ~~„u~~~~l~~~~~, ~~~~ „•~,•~„•..I I:~al pagc.l 1 02
<br />fruita/2
<br />ATTACHMENT A
<br />
|