My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02294 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02294 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:57 AM
Creation date
2/2/2009 11:16:57 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153396
Contractor Name
Fruita, City of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br />1. Board approval oP engineering Plrm and engineering <br />agreement between engineering Plrm and project sponsor. <br />2. Preparation of detailed plans and speclPlcatlons for <br />authorized projects by consulting engineering firm. <br />3. Approval of detailed plans and speclPlcatlons by Board <br />staff (plans and specLflcations Por storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br />4. Board staff approval of bidding Por the project. Board <br />staff present at bid opening for construction. <br />5. Project sponsor may issue the of award and the <br />notice to proceed with s ru t to the contractor <br />(both notices must be a ;, a Board staff before <br />they are issued). <br />6. Conduct a pre-construction r p royal of <br />construction sched Bo a <br />7. Construction commen he Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff !n advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br />8. The consulting englneer~certlfies that the project has <br />been completed according to approved drawings and <br />speclPlcatlons and arranges Por Plnal inspection. <br />9. Final inspection and acceptance of as-built profect by, <br />Board staff. <br />10. Submittal of as-built drawings to Board staff for <br />approval and filing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.