My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02291 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02291 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:11 AM
Creation date
2/2/2009 11:10:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150280
Contractor Name
Park Center Water District
Contract Type
Loan
Water District
0
County
Fremont
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Park Center Water District <br />Well Redrilling Project <br />January 27, 2009 <br />Page 2 of 2 <br />B) Contracting: An approved contract must be in place before funds can be disbursed. Vaughn <br />McWilliams will initiate the loan contracting process for this project. When all of the contract <br />conditions are met and the contract is executed the District may request loan funds to cover <br />eligible project expenses. You can contact Vaughn at (303) 866-3441 x 3227 regarding the <br />requirements. The contract will include the following contract provision: <br />1) If the District is successful in obtaining federal assistance through congressional funding <br />or it (in conjunction with the BLM) receives emergency funds for well drilling, it will apply <br />such funds towards repayment of the CWCB loan. <br />C) Design/Construction: You must adhere to the CWCB Design and Construction Administration <br />Procedures. Tim Feehan will contact you regarding this phase of the process. Tim will make <br />construction site visits, which will be the basis of pay estimates for disbursement of your loan <br />funds. You can contact Tim at his desk at (303) 866-3441 x 3211 or cell phone (303) 618- <br />5010. <br />On behalf of the Board, I would like to thank you for your interest in a loan from the Colorado Water <br />Conservation Board. <br />Sincerely, <br />~.,~,__I <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Attachment: Updated Board Memo <br />E-mail Copy (Including Attachments) <br />Anna Mauss, P.E. <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Reed Dils, Board Member -Arkansas River Basin <br />Roy Smith, BLM <br />Susan Schneider, AGO <br />CWCB Finance Section Staff <br />
The URL can be used to link to this page
Your browser does not support the video tag.