Laserfiche WebLink
the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100 %) interest in any rights that the Borrower holds in the Project <br />consisting of approximately four (4) miles of pipeline and the associated access <br />easement rights, as more particularly described in the attached Deed of Trust <br />( "Collateral "). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />The CWCB approved the loan with the following conditions: <br />a. The BORROWER provide a copy of the executed USDA Conservation Program <br />Contract to verify that the USDA would provide engineering services and a grant <br />for $391,140.00. Copy of said contract is included with the above Feasibility <br />Study referred to in Section 2 above. <br />b. Security for the loan includes (1) a pledge of assessment revenues backed by an <br />assessment covenant, (2) a debt service reserve fund equal to two annual loan <br />payments (one payment set aside at the time of contract execution and one third <br />of an annual payment set aside at the time the first three annual loan payments <br />are made), and (3) a security interest in the BORROWER's Funding Agreement, <br />which Funding Agreement shall include a "step -up" provision that requires the <br />Funding Agreement signatories to make the entire annual loan payment to the <br />CWCB in the event any of the members fail to pay their assessed share amount <br />pursuant to the Funding Agreement. <br />c. Within ten (10) working days after receipt of the $391,140.00 cost share portion <br />reimbursement from the USDA, the BORROWER shall submit to the CWCB an <br />amount equal to the reimbursement. The USDA reimbursement will be applied to <br />the outstanding principal loan balance, and the Loan Contract and Promissory <br />Note shall be amended to reduce the loan amount and the annual payment due. <br />Other contract terms, including interest rate and loan repayment period shall <br />remain unchanged. <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER's and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />Appendix 1 to Loan Contract C150249 <br />Page 2 of 4 <br />