My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02281 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02281 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:51 AM
Creation date
2/2/2009 10:57:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150223
Contractor Name
Keenesburg, Town of
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Keenesburg <br />March 21-22, 2006 <br />Agenda Item t7c <br />Transporting the Roggen well water to the Town would require two lift stations. The estimated cost <br />of this alternative is approximately $2.6 million. This alternative would bring additional water <br />quantity to the Town for future growth, but would not result in a significant improvement in the <br />Town's current water quality. <br />Selected Alternative 2, Purchase PV Water- The selected alternative is the purchase of 139.6 <br />AF of well water rights in the Lost Creek Groundwater Basin, construction of a new replacement <br />well with a variable speed pump, construction of 5.5 miles of 8" transmission pipeline to the Town, <br />and completion of the water blending facility at the Town's existing water tank. <br />The Total Project cost is estimated to be: <br />1. Water Rights Purchase $1,116,800 <br />2. Construction -Pipeline, Well, Structures 911,480 <br />3. Engineering 157,230 <br />4. Contingency (15%) 136,690 <br />TOTAL $2,322,200 <br />Schedule -The purchase of the water rights is expected to occur with the next 90 days, and the <br />overall project is expected to be completed in late 2007. <br />Financial Analysis <br />The total estimated cost of the project is $2,322,200. The Town qualifies for the Municipal Middle- <br />Income interest rate, and staff is recommending a maximum loan amount of $1,508,000 (65% of the <br />estimated project cost) for 30 years at an interest rate of 3.75%. The Town will pay the 35% local <br />share ($814,200) of the project cost using existing reserve water funds. <br />Table 1 is a summary of the financial aspects of the project. A CWCB Loan of $1,508,000 would <br />have an annual payment of $93,038 (including the 10% reserve requirement) at the loan terms of <br />3.75% for 30 years. <br />Table 1. Financial Summary <br />Project Cost $2,322,200 <br />Number of Existin Water Ta s 461 <br />CWCB Loan Amount 30 ears $1,508,000 <br />CWCB Loan Pa ment includes 10% reserve - Be in 2007 $93,038 <br />Current Monthl Water Rate Avera a $22 <br />Future Total Monthl Water Cost w/o DOLA rant $30 <br />Monthl Per Ta Cost of CWCB Loan $16.82 <br />Annual Loan Cost per Acre-Foot (based on aver. 139.6 ac.-ft. delivery) $666 <br />Table 2 shows the Financial Ratios and indicates overall average to strong ability to repay the <br />$1,508,000 CWCB loan, with the increased water rates. <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.