My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02274 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02274 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 11:19:20 AM
Creation date
2/2/2009 10:18:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150164
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
58
County
Moffat
Routt
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ELKHEAD RESERVOIR ENLARGEMENT <br />COLORADO WATER CONSERVATION BOARD <br />FEASIBILITY REPORT <br />Prepared By: <br />COLORADO RIVER WATER CONSERVATION DISTRICT <br />September, 2003 <br />INTRODUCTION <br />The Colorado River Water Conservation District (River District), in conjunction with the Upper <br />Colorado Endangered Fishes Recovery Program (Recovery Program) propose to enlarge Elkhead <br />Reservoir, northwest of Craig, Colorado for purposes of supporting the recovery of endangered fish <br />species and to satisfy needs for supplies of municipal, industrial and agricultural water in the Yampa <br />River Basin. <br />Financially, the River District will be responsible for a pro rata share of costs associated with the <br />human water supply created in the enlargement. The Recovery Program is responsible for the share <br />of costs for the endangered fish pool. Elkhead Reservoir currently has a capacity of 13,000 acre-feet <br />(af) and will be enlarged by approximately 12,000 af, 7,000 of of which will be the human pool and <br />5,000 of of which will be the endangered fish pool. Therefore, the River District is responsible for <br />7/12ths, or 58 percent of project cost and the Recovery Program is responsible for 5/12ths, or 42 <br />percent. <br />The current total cost estimate for the expansion is $19.SMM. <br />The River District intends to finance its share of the project using a loan from the Colorado Water <br />Conservation Board's (CWCB) Construction Fund. A portion of the Recovery Program share, in the <br />amount of $2MM, will also be financed through the CWCB construction fund. The balance of the <br />Recovery Program share will be cash funded. <br />The River District is acting as project manager and agent on behalf of the Recovery Program in <br />pursuit of the enlargement. <br />This report is prepared to satisfy the CWCB's requirements of a demonstration of financial and <br />technical feasibility in support of the loan application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.