My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02273 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02273 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:14 AM
Creation date
2/2/2009 10:17:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150083
Contractor Name
John Peroulis and Sons Partnership
Contract Type
Loan
Water District
44
County
Moffat
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOHN PEROULIS & SONS PARTNERSHIP <br />MARTIN CULL RESERVOIR REHABILITATION <br />,; ,~. <br />~~`_ :~~ <br />Proiect Description <br />This $300,000 project involved the rehabilitation of Martin Cull Reservoir, located <br />approximately 28 mile north of Craig, Colorado. In the summer of 2000 a slide occurred along the <br />upstream face of the dam embankment, which caused the State Engineer's Office to impose a zero <br />storage restriction on the facility. Improvements to the reservoir included reconstructing the <br />upstream face of the embankment, bringing the downstream face of the embankment to a more <br />stable configuration and replacing the existing outlet structure and pipe with a new structure. <br />Proiect Data <br />Sponsor: John Peroulis & Sons Partnership County: Moffat Water Source: Fortification Creek <br />Terms of Loan: $250,000@ 2.75% for 30-years Substantial Completion Date: Nov. 1, 2002 <br />Design Engineer: Northwest Colorado Consultants, Inc. -Steamboat Springs, CO. <br />Construction Contractor: Native Construction, Inc. -Steamboat Springs, CO. <br />Design Elements: Precast Gate Chamber w/12" Sluice Gate <br />500 L.F. of 12" PVC Outlet Pipe <br />70,000 C.Y. Excavation and Backfill <br />Annual Volume of Water Delivered by the Project: 330 acre-ft. <br />Looking Across Dam Crest and Upstream Face of Dam to the Left <br />
The URL can be used to link to this page
Your browser does not support the video tag.