Laserfiche WebLink
<br />Project Name: Phase 2 Economic Life, Denver Basin Aquifer Study AGENCY# ~ ' ., <br />Performance Period: February 1997 to Aug 1997 ROUTiNG# d lo~[S~ <br />Fiscal Year: 1996 CONTRACT# ;~__ "~~~ _ ~_ <br />Amount: Part A 530,000.00; Part 6 533,500.00 <br />CONTRACT AGREEMENT <br />This Contract, made this 21 day of February, 1997, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board, hereinafter referred to as the State, and HRS Water Consultants, Inc. <br />located at 200 Union Blvd., Suite 200, Lakewood CO 80228, hereinafter referred to as <br />the Contractor. <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and <br />otherwise made available, the sufficient unencumbered balance thereof remains available <br />far payment of a total of 5 30,000.00 from Fund No. 424, APPR. 625, Object Code 1920, <br />Contract Encumbrance No. ;and <br />WHEREAS, the Division of Water Resources and The Colorado Water Conservation Board <br />have been authorized and directed through SB 96-153, Section 10, to conduct or have <br />conducted under the direction of the State Engineer and Director of the Colorado Water <br />Conservation Board the technical analysis of the economic life of the Denver Basin Aquifer; <br />and <br />WHEREAS, the scope of work has been reviewed and approved by the Colorado Water <br />Conservation Board; and, <br />WHEREAS, the contractor's response to RFP PEA-703V was selected as the best value to <br />the State and is attached as Exhibit A; and, <br />WHEREAS, required approval, clearance and coordination has been accomplished from and <br />with appropriate agencies; and <br />NOW, THEREFORE, it is hereby agreed that <br />A. Background and Genera! Scope of Work: The Scope of Work is Attached as Exhibit <br />A; which consists of the proposal for Phase 2 analysis of the Denver Basin Aquifer <br />prepared by HRS Water Consultants Inc. The Schedule B: (Table 2) work plan are <br />to proceed only upon the written notice by the State. <br />Page 1 of 8 <br />