My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02238
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:31 AM
Creation date
1/16/2009 3:40:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153847
Contractor Name
Hydrosphere Resource Consultants
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CODE OF COLORADO REGULATIONS <br />1CCR101-9 <br />SOLE SOURCE PROCUREMENT <br />3-205 Conditions for Use of Sole Source Procurement <br />Sole source procurement is not permissible unless a requirement is available from only a single <br />supplier. A requirement for a particular proprietary item does not justify a sole source procurement if <br />there is more than one potential bidder or offeror for that item. The following examples of <br />circumstances which could necessitate sole source procurement: <br />(a) where the compatibility of equipment, accessories, or replacement parts is the paramount <br />consideration; <br />(b) where a sole supplier's item is needed for trail use or testing; <br />(c) where a sole supplier's item is to be procured for resale; or <br />(d) where public utility services are to be procured. <br />The Director, the head of the purchasing agency, or the designee of such person, shall make a written <br />determination that a procurement is sole source, setting forth the reasons. In cases of reasonable doubt, <br />competition should be solicited. Any request by a using agency that a procurement be restricted to one <br />potential contractor shall be accompanied by an explanation as to why no other will be suitable or <br />acceptable to meet the need. <br />PLEASE NOTE: <br />Insufficient time for conducting a competitive procurement is NOT a lawful reason for selecting the <br />sole source procurement option. <br />I:solesrce.inf <br />
The URL can be used to link to this page
Your browser does not support the video tag.